Skip to main content

Little Venus Fire (Wyoming) – July 18, 2006

This Day in History is a brief summary of a powerful learning opportunity and is not intended to second guess or be judgmental of decisions and actions. Put yourself in the following situation as if you do not know the outcome. What are the conditions? What are you thinking? What are YOU doing?

Background

On June 19, 2006, the Little Venus Fire began as a naturally ignited wildland fire on the Shoshone National Forest. The fire was managed for resource benefits under a wildland fire use strategy. Fire behavior and growth responded to the ebb and flow of weather over the first month, but around the middle of July, fire activity steadily increased. On July 17 at 1730, the Unaweep Fire Use Module (FUM) arrived at the Forest Supervisor’s Office in Cody, WY. Unaweep consisted of four regular crewmembers and six long-term and short-term detailers. They received an initial briefing and secured supplies to support remote fire operations in the Washakie Wilderness. During the in-briefing, the module leader was advised that radio communications had been a persistent problem on the incident. Operations believed they would have two portable repeaters fully functional on the incident by July 19 and Unaweep had a satellite phone. July 19 was Unaweep’s planned first operational assignment on the Little Venus Fire. On July 18, the work assignment for Unaweep was to hike eight miles from the Jack Creek Trailhead to the Venus Cabin to replace the Black Hills FUM. Two local, contracted packers would transport food and red bags from Jack Creek trailhead to Little Venus cabin on the morning of July 18.

Fuels

Conifer timber stands with severe bark beetle infestations – approximately 50% stand mortality.  

Weather

RED FLAG CONDITIONS. The spot weather forecast predicted: Maximum Temperature:  76­82°, Minimum Humidity:  8­14% , 20 Foot Winds:  SW 15-20, gusts to 35, shifting to NW at 1400 hrs, Ridge Top Winds:  SW 20­25. The Incident Action Plan (IAP) weather forecast also had 20-foot winds: 15, gusts to 30 out of the W. The fire behavior forecast in the IAP under­predicted a significant increase in fire behavior.

Topography

Major canyon, steep slopes with numerous side drainages. Greybull River drainage runs SSW to NNE.

Image
Aerial image of the Deployment sites and escape routes along Greybull River and Anderson Creek during the Little Venus Fire entrapment, 2006.

Outcome

As Unaweep hikes into Venus Cabin, a sharp wind shift fans a fast-moving crown fire with long-range spotting that outpaces the crew’s escape. All ten Unaweep crewmembers experienced a burn over and deployed their shelters at the Greybull River confluence with Anderson Creek.  All personnel survived with no significant injuries and no hospitalization; all were safely evacuated from the fire area.

Discussion Questions:

  • Is hiking into a fire an operational assignment? 
  • How do we safely engage wildfires in dead or dying fuel types or drought stressed fuel types?
  • How do we adapt operational tactics based upon a forecasted wind shift? 
  • What are some techniques to deal with poor VHF repeater coverage for an incident?
  • Use of detailers or “fills” on fire resources is even more common today with recruitment and retention challenges. How will you build crew cohesion and trust with crewmembers that are new to your crew’s operational tempo?

 

Last Modified / Reviewed:


Have an idea or feedback?

Share it with the NWCG 6MFS Subcommittee
 


Follow NWCG on X and Facebook
 


 

NWCG Latest Announcements

Updated NWCG Standards for Wildland Fire Resource Typing, PMS 200 Now Includes Off-Highway Vehicle Typing Standards

Date: May 13, 2025
Questions?  Please contact:
Mobile Fire Equipment Subcommittee 

The NWCG Standards for Wildland Fire Resource Typing, PMS 200 has been updated to include newly developed Off-Highway Vehicle (OHV) typing standards. These standards organize OHV information into logical categories and outline key safety requirements for occupants.

NWCG Standards for Wildland Fire Resource Typing, PMS 200 establishes minimum typing standards for aircraft, crews, and equipment used in national mobilization to wildland fire incidents. Typing designations are assigned based on measurable capability and performance criteria.

References:

NWCG Standards for Wildland Fire Resource Typing, PMS 200

NEW! S-204, Interpersonal and Critical Thinking Skills for Safety Officers Now Available

Date: May 12, 2025
Questions?  Please contact:
Risk Management Committee

The S-204, Interpersonal and Critical Thinking Skills for Safety Officers self-directed online course is now available! Developed through the Incident Performance and Training Modernization (IPTM) effort, this training supports individuals working towards Safety Officer, Field (SOFF) incident qualifications.

S-204, Interpersonal and Critical Thinking Skills for Safety Officers focuses on facilitating hazard mitigation conversations and building trust to influence safety-related decisions. Individuals can self-enroll through the Wildland Fire Learning Portal (WFLP).

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

S-204, Interpersonal and Critical Thinking Skills for Safety Officers 

NWCG Safety Officer, Field (SOFF) Position Page

Wildland Fire Learning Portal

Great Basin Cache Upgrading to New Inventory System

Date: May 7, 2025
Questions?  Please contact:
Great Basin Cache
Phone: (208) 387-5104
Fax: (208) 387-5573

The Great Basin Cache (GBK) is transitioning to a new inventory system to better serve the wildland fire community. During this upgrade, GBK will be unable to process standard orders from Part 1: Fire Supplies and Equipment and Part 2: Publications between May 8-20, 2025, with exceptions made for emergency fire orders. Orders will be accepted through close of business May 7.

To browse the latest available items, please refer to the National Fire Equipment System (NFES) catalogs. 

References:

NWCG NFES Catalog-Part 1: Fire Supplies and Equipment, PMS 449-1

NWCG NFES Catalog-Part 2: Publications, PMS 449-2

NEW! Air Operations Summary (ICS 220 WF) Now Available

Date: May 2, 2025
Questions?  Please contact:
National Interagency Aviation Committee

The Air Operations Summary (ICS 220 WF) provides the Air Operations Branch with the number, type, location, and specific assignments of helicopters and air resources. The new ICS 220 WF also includes medical extraction capabilities and air resources tracking.

Understanding the capabilities of aviation assets is critical for effective medical and extraction responses. Coordination with the Medical Unit Leader is essential to ensure alignment and consistency between the ICS 220 WF and the Medical Plan (ICS 206 WF). 

References:

Air Operations Summary (ICS 220 WF)

National Interagency Aviation Committee

Incident Command System (ICS) Forms