Skip to main content

Submission of Innovative Ideas

Image
ETC header graphic. photo of firefighter with a hose inset in photo of fire.  Decorative.

Key Points

  • The Innovation Proposal Form must contain:
    • Innovation Proposal
    • Implementation Narrative
    • Safety Narrative
  • The submission of the Innovation Proposal Form may constitute a public disclosure. Please check with the United States Patent and Trademark Office for information and timelines.
  • The Equipment Technology Committee (ETC) or the NWCG partner agencies are not responsible for the cost incurred in the preparation of proposals.
  • Materials submitted to ETC through the Innovation Proposal process may not be returned.
  • Funding for further development of a concept or product is not available through this process.
  • ETC or cooperating agencies may be working on the same or a similar idea already from another individual or organization.

Introduction

This procedure outlines the process for submitting innovative ideas to improve wildland firefighter safety, operating efficiency, and cost reduction. NWCG encourages the submission of innovative ideas or product proposals (collectively, Innovation Proposal) that will contribute to its mission. ETC is chartered under NWCG and is responsible to receive and review these proposals as part of the innovation and program lifecycle process. ETC will review innovative proposals to determine whether the innovation can be practically implemented into wildland fire suppression, prevention, or rehabilitation operations.

Innovative ideas include new technology, significant improvement to existing products or new application of existing technology. Feedback to assist the proponent to develop the concept, idea, or product further will be provided when appropriate. However, this does not imply interest or endorsement of the idea, concept, or product.

Submission of Innovative Proposals

ETC will consider innovation proposals from individuals, organizations, and manufacturers. There are no specific dates for the submission of innovation proposals; however, proposals are only reviewed twice a year. The cutoff dates are March 15 and September 15. Submissions received after the cutoff date will be accepted but not reviewed until after the next cutoff date. Receipt of proposals will be acknowledged via electronic or written communications.

Multiple submissions of an Innovation Proposal to other ETC members or cooperating agency offices are not necessary. This central receipt point is aware of other areas of interest and tries to ensure that each proposal is sent to potentially interested programs.

The proposals will be reviewed fairly and objectively by subject matter experts available to ETC. The proposer will be notified of the results of the review. Correspondence will be sent to the proposer within 60 days after the cut-of date. The proposer will be contacted if more information or time is needed for the response.

The submission of the proposal form constitutes a public disclosure and may affect the application of a patent. Please refer to the United States Patent and Trademark Office for more information. The disclosure of an Idea to ETC does not establish a confidential relationship or obligate ETC and cooperating agencies to treat the idea (or any related materials) as secret or confidential.

What to Submit

Each proposal should be self-contained and written with clarity and thoroughness. The Innovation Proposal, at a minimum, must contain the following items:

  • Innovation Proposal
  • Implementation Narrative
  • Safety Narrative

The Innovation Proposal Form serves as a base document for the proposal.

It is used to assess which program area it is most applicable to. The Innovation Proposal Form is below.

An Implementation and Safety narrative, no more than 500 words, must be included to identify the following:

  • Objectives.
  • Implementation. How the proposed idea could be implemented operationally.
  • Safety and training requirements.

Additional documents such as technical drawings, artist sketches, or product brochures should also be submitted. Concepts must be validated by test results and test methods. Prototypes or product samples may be requested later as part of the evaluation process.

Review Process

The Innovation Proposal document package will be reviewed to determine if further evaluation is warranted. The review panel consists of subject matter experts within the National Technology & Development Program (NTDP) and other cooperating agencies. The review panel will recommend one of the following:

  1. No further action – The proposal does not meet agency needs, is not a new product or application of an existing product, or implementation is beyond the scope of the agency.
  2. Evaluate as part of product lifecycle – The product can be included in a current specification and will be evaluated as part of the lifecycle to improve products covered in that specification.
  3. The proposal meets a need; however, further development beyond the authority of ETC through this program is needed – The proposal may be referred to other programs for consideration if the submitter is looking for funding assistance. Funding for further development of a concept or product is not available through the innovation process.
  4. The proposal has merit; however, more information is needed.

Submissions are reviewed twice annually. Cutoff dates are March 15 and September 15.

Submission Form

  • Receipt of proposals will be acknowledged via electronic or written communications.
  • The submission of the Innovation Proposal Form is entirely voluntary.
  • Multiple submissions are not necessary, your proposal will be shared with other cooperating agencies.

We're temporarily unable to accept attachments through this form. Please email your attachments to your form submission directly to NWCG Webmaster at BLM_FA_NWCG_Webmaster@blm.gov. We apologize for any inconvenience.

NWCG Latest Announcements

Incident Position Standards and the Next Generation Position Task Books Now Available for RADO and INCM

Date: July 30, 2025
Questions?  Please contact:
Incident Logistics Subcommittee
 

NWCG is excited to announce that Incident Position Standards and the Next Generation Position Task Books are now available for Radio Operator (RADO) and Incident Communications Center Manager (INCM).

The Performance Support Packages for these positions were developed as part of the Incident Performance and Training Modernization effort. These resources support trainees, qualified personnel, and evaluators in their respective roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1, scheduled for January 2026.

References:

NWCG Radio Operator Position Page

NWCG Incident Communications Center Manager Position Page

ETC Equipment Bulletin: 25-004 NEW Aquatic Invasive Species – Golden Mussels

Date: July 29, 2025
Questions?  Please contact:
Equipment Technology Committee
 

The Equipment Technology Committee (ETC) issued Equipment Bulletin: 25-004, notifying the wildland fire community about a newly discovered invasive species and actions to take if found. Golden mussels, a highly invasive species recently identified in California, pose a significant risk to native ecosystems, infrastructure, and fire equipment. These mussels rapidly colonize hard and soft surfaces, including aquatic plants and fire equipment, clogging pipes, fouling motors, disrupting water systems, and impacting native species.

To help prevent their spread, fire personnel must follow the decontamination procedures outlined in the NWCG Guide to Preventing Aquatic Invasive Species Transport by Wildland Fire Operations, PMS 444. Additionally, report any sightings immediately to your Lead Resource Advisor and include clear, close-up photos and location details.

Read the complete ETC Equipment Bulletin: 25-004 to learn more. 

References:

NWCG Alerts

ETC Equipment Bulletin: 25-004

NWCG Guide to Preventing Aquatic Invasive Species Transport by Wildland Fire Operations, PMS 444

Incident Position Standards and the Next Generation Position Task Books Now Available for ICT5 and FFT1

Date: July 29, 2025
Questions?  Please contact:
Incident Command Subcommittee
Incident Operations Subcommittee

NWCG is excited to announce that Incident Position Standards and the Next Generation Position Task Books are now available for Incident Commander Type 5 (ICT5) and Firefighter Type 1 Squad Boss (FFT1).

The Performance Support Packages for these positions were developed as part of the Incident Performance and Training Modernization effort. These resources support trainees, qualified personnel, and evaluators in their respective roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1, scheduled for January 2026.

References:

NWCG Incident Commander Type 5 Position Page

NWCG Firefighter Type 1 Squad Boss Position Page

Incident Position Standards and the Next Generation Position Task Books Now Available for ATBM and FWBM

Date: July 28, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

NWCG is excited to announce that Incident Position Standards and the Next Generation Position Task Books are now available for Airtanker Base Manager (ATBM) and Fixed Wing Base Manager (FWBM).

The Performance Support Packages for these positions were developed as part of the Incident Performance and Training Modernization effort. These resources support trainees, qualified personnel, and evaluators in their respective roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1, scheduled for January 2026.

References:

NWCG Airtanker Base Manager Position Page

NWCG Fixed Wing Base Manager Position Page