Incident Summary:

On August 5, 1999, a dry lightning storm passed through northern Nevada, igniting numerous fires. Due to a wet winter and spring, the fuels were abnormally heavy. Now, deep into summer, these fuels are measuring less than 80% live fuel moisture. Normal fire suppression tactics have not been effective on previous fires, particularly direct attack and burning operations during the heat of the day. The weather and fire behavior forecasts predicted extreme burning conditions. The same day as the lightning storm, a Type 2 crew—the Golden Gate 3 (GNP3)—was assembled in California. This crew consisted of 21 members, 17 of them Firefighter Type 2 (FFT2), from fuels and suppression modules as well as non-fire and overhead positions from various home units. The following day, they were dispatched to the Sadler Complex south of Elko, Nevada. For the next two days, they worked on the fireline. On day 3, August 9, while conducting a burnout operation, six firefighters from the GNP3 crew were entrapped by wildfire.


0600 – Briefing started unannounced, and several crews and overhead missed some and/or all of it. Briefing placed little emphasis on a red flag warning that had been issued for high winds, low relative humidity (RH), and unstable atmospheric conditions. The Incident Action Plan (IAP) forecast called for extreme fire behavior with high rates of spread, south winds increasing in afternoon, minimum RH 6 - 12%, Haines Index of 6, maximum temperatures of 85 - 91 °F, and a Fine Dead Fuel Moisture (FDFM) of 3%. However, there were not enough IAPs for everyone, including the GNP3 Crew Boss and a Division Supervisor (DIVS). Extreme fire behavior was discussed at the GNP3 crew briefing and characterized as “normal.”

0900 – GNP3 was assigned to support two interagency hotshot crews (IHCs). The crews were asked to burnout from Big Safety Zone to the northwest and the dozer line to Black Safety Zone. The dozer line was about ½ mile north of the head of the fire.

1100 – After a recon, the IHC superintendents refused to accept the burnout assignment until the line south of Big Safety Zone was secure. The DIVS and the two IHCs leave to do the other burnout. GNP3 wait.

1300 – GNP3 accepted the assignment to burn out across the head of the fire from Black Safety Zone east to the Y.

1400 – Ignition was delayed due to unfavorable winds. Overhead felt if they “didn’t attempt a burn, the fire would get away.” The plan was changed to burnout from the east to the west instead — the very plan the IHCs refused.

1430 Due to concerns regarding GPN3’s lack of experience and fitness, only three members and the Crew Boss were used for the firing operation.

1500 – This squad began firing from the Y, without an anchor point, supported by an engine. The fireline behind them was unsecured. Due to hills, no one on the burnout squad could see the main fire. There were no aircraft to assist as lookout. Because of occasional wind shifts, the igniters must walk very fast and occasionally trot to keep ahead of their fire. They were unable to use the black as a safety zone. For the burning conditions, safety zones along the dozer line were too small and too far apart.

1515 Back behind the firing squad, the engine was very busy picking up multiple spot fires and slopovers. The Engine Boss radioed to stop ignition. There was no response. The same tactical channel was also being used by the other burnout and was overloaded with traffic.

1530 Halfway through the 1.3-mile burnout, two more GNP3 members joined the firing squad.

1540 Overhead watching the burnout saw the main fire become visible and take off down the hill toward the squad. They attempted to warn the squad but were unable to make radio contact. Shortly after, the main fire became visible to the squad as it crested the ridge to the south. It was described as a “river of fire” as it made a run at the dozer line and the crew at speeds in excess of 300 chains per hour with 15-foot flame lengths.

The engine was cut off from the squad and they retreated to a safety zone. The order to run was given to the firing squad. Tools and gear were dropped on the way to the safety zone, almost 600 feet. away. Several crew members unsuccessfully attempted to deploy their fire shelters.

Crew members received 1st and 2nd degree burns and smoke inhalation. An injured crew member, an EMT  suffering from smoke inhalation, was asked to provide first aid for the others.

Discussion Points:

  • What are your responsibilities if you are asking another resource to take an assignment that was previously turned down?
  • The burnout was a potentially dangerous assignment. What will you do to size up your resource’s capabilities and experience and assign them to appropriate tasks?
  • As a crew/crew member, you have a responsibility to look after your own safety, which includes the right to accept or reject an assignment. Using the Incident Response Pocket Guide (IRPG), PMS 461 have everyone discuss how to properly refuse risk.
  • Discuss how you and your crew would apply LCES throughout the day on this incident.

 

6MFS Suggestion Form


Have an idea or feedback?

Share it with the NWCG 6MFS Subcommittee
 


Follow NWCG on X and Facebook
 


 

Last Modified / Reviewed:

NWCG Latest Announcements

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

Date: June 3, 2025
Questions?  Please contact:
Emergency Medical Committee

The Emergency Medical Committee has issued interim guidance for Rapid Extraction Module Support (REMS) teams. Until further notice, Type I and II REMS teams must designate a team leader qualified at Firefighter Type 1 Squad Boss (FFT1) or higher. This temporary change replaces the Single Resource Boss (SRB) requirement, which is currently not feasible due to administrative barriers.

This memorandum does not include any other changes to the NWCG Standards for Rapid Extraction Module Support, PMS 552. This interim change takes effect immediately and will remain in place until further notice.

References:

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

NWCG Standards for Rapid Extraction Module Support, PMS 552

Equipment Bulletin 25-002: Chaps, Chain Saw, M-2020, Nonconformities Affecting Use, Appearance, and Serviceability

Date: June 2, 2025
Questions?  Please contact:
Equipment Technology Committee

The Equipment Technology Committee issued Equipment Bulletin: 25-002 to address a manufacturing nonconformity affecting Forest Service specification, 6170-4K Chain Saw Chaps. The issue applies to chaps manufactured in 2024 and 2025 and distributed through FedMall. These chaps may have incorrectly bound edges that expose inner protective layers.

Independent purchasers should inspect all chain saw chaps received from FedMall beginning in 2024, prior to use. Review the full Equipment Bulletin: 25-002 for inspection criteria and recommended actions.

References:

NWCG Alerts

ETC Equipment Bulletin: 25-002

2024 Wildland Fire Emergency Medical Service Awards

Date: May 22, 2025
Questions?  Please contact:
Emergency Medical Committee

The NWCG Emergency Medical Committee (EMC) is proud to announce the recipients of the 2024 Wildland Fire Emergency Medical Service Awards. Each year, EMC recognizes individuals and groups who have demonstrated exceptional actions or accomplishments that go above and beyond their normal mission or job duties.

Congratulations to all the awardees and nominees. Through leadership and initiative, they have made significant contributions to the safety and well-being of the wildland fire community. These honors are well deserved.

References:

2024 Wildland Fire EMS Awards

NWCG Emergency Medical Committee

NWCG Welcomes the Incident Management Teams Association as an Associate Member

Date: May 21, 2025
Questions?  Please contact:
https://www.nwcg.gov/contact-us

The NWCG Executive Board is honored to announce that the Incident Management Teams Association (IMTA) has joined the National Wildfire Coordinating Group as an associate member.

IMTA is a dedicated group of incident management professionals committed to enhancing the profession by promoting standards and fostering collaboration across federal, state, local, Tribal, and private sector partners throughout all phases of incident management.

“Joining NWCG aligns with our mission to elevate incident management professionals nationwide,” said Dr. Randal Collins, President of IMTA. “This is a proud moment for all of us committed to advancing public safety.”

References:

Incident Management Teams Association

National Wildfire Coordinating Group