Skip to main content

Hazard Tree – Felling Hang-ups

 

hazard-tree-hang-ups. Photograph looking up into tree tops and seeing one tree leaning up against another.Felling a hung-up hazard tree is a particularly hazardous and complex task. Safely felling a hang-up requires extreme caution and expertise.

The following are some topics sawyers should review during tailgate safety discussions to address felling hang-up hazard trees:

Size up and Evaluation:

  • Cut/No Cut (walk-away). Is tree secure and does it need to come down?
  • What type of hang-up? In a fork, pinched between two trees, or resting on limbs?
  • Vertical hang-ups have increased complexities.
  • Condition of all relevant trees live, dead, rot, etc. Does the hang-up tree have any weak areas that could fail?
  • Obscured view of top?
  • If sawyer is unsure of the outcome, do not attempt to cut a leaner.

Operational Considerations:

  • Escape routes for unforeseen circumstances?
  • Consider falling trees as a group.
  • Consider face cuts versus slash cuts for directional control.
  • Rope technique allows increased distance from danger zones.

Alternative Mitigations:

  • Blasting.
  • Heavy equipment/cable.
  • No Work Zones.

Discuss any personal lessons learned with hang-up trees that you may have experienced.

 

Category

Last Modified / Reviewed:


Have an idea or feedback?

Share it with the NWCG 6MFS Subcommittee
 


Follow NWCG on X and Facebook
 


 

NWCG Latest Announcements

Updated NWCG Standards for Wildland Fire Resource Typing, PMS 200 Now Includes Off-Highway Vehicle Typing Standards

Date: May 13, 2025
Questions?  Please contact:
Mobile Fire Equipment Subcommittee 

The NWCG Standards for Wildland Fire Resource Typing, PMS 200 has been updated to include newly developed Off-Highway Vehicle (OHV) typing standards. These standards organize OHV information into logical categories and outline key safety requirements for occupants.

NWCG Standards for Wildland Fire Resource Typing, PMS 200 establishes minimum typing standards for aircraft, crews, and equipment used in national mobilization to wildland fire incidents. Typing designations are assigned based on measurable capability and performance criteria.

References:

NWCG Standards for Wildland Fire Resource Typing, PMS 200

NEW! S-204, Interpersonal and Critical Thinking Skills for Safety Officers Now Available

Date: May 12, 2025
Questions?  Please contact:
Risk Management Committee

The S-204, Interpersonal and Critical Thinking Skills for Safety Officers self-directed online course is now available! Developed through the Incident Performance and Training Modernization (IPTM) effort, this training supports individuals working towards Safety Officer, Field (SOFF) incident qualifications.

S-204, Interpersonal and Critical Thinking Skills for Safety Officers focuses on facilitating hazard mitigation conversations and building trust to influence safety-related decisions. Individuals can self-enroll through the Wildland Fire Learning Portal (WFLP).

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

S-204, Interpersonal and Critical Thinking Skills for Safety Officers 

NWCG Safety Officer, Field (SOFF) Position Page

Wildland Fire Learning Portal

Great Basin Cache Upgrading to New Inventory System

Date: May 7, 2025
Questions?  Please contact:
Great Basin Cache
Phone: (208) 387-5104
Fax: (208) 387-5573

The Great Basin Cache (GBK) is transitioning to a new inventory system to better serve the wildland fire community. During this upgrade, GBK will be unable to process standard orders from Part 1: Fire Supplies and Equipment and Part 2: Publications between May 8-20, 2025, with exceptions made for emergency fire orders. Orders will be accepted through close of business May 7.

To browse the latest available items, please refer to the National Fire Equipment System (NFES) catalogs. 

References:

NWCG NFES Catalog-Part 1: Fire Supplies and Equipment, PMS 449-1

NWCG NFES Catalog-Part 2: Publications, PMS 449-2

NEW! Air Operations Summary (ICS 220 WF) Now Available

Date: May 2, 2025
Questions?  Please contact:
National Interagency Aviation Committee

The Air Operations Summary (ICS 220 WF) provides the Air Operations Branch with the number, type, location, and specific assignments of helicopters and air resources. The new ICS 220 WF also includes medical extraction capabilities and air resources tracking.

Understanding the capabilities of aviation assets is critical for effective medical and extraction responses. Coordination with the Medical Unit Leader is essential to ensure alignment and consistency between the ICS 220 WF and the Medical Plan (ICS 206 WF). 

References:

Air Operations Summary (ICS 220 WF)

National Interagency Aviation Committee

Incident Command System (ICS) Forms