Skip to main content

Constructing Line Without a Safe Anchor Point

8. Constructing line without safe anchor point. A red fire engine is located inside a burned area with flames all around it while a firefighter sprays water from a hose at some of the flames.

An anchor point is an advantageous location, usually a barrier to fire spread, from which to start constructing a fireline. This Watch Out depicts an engine crew working along the fire edge without a clear anchor point.

Read about all 18 Watch Out Situations.

When deciding where to build a fireline, the following considerations must be weighed:

  • Can you hold the line? How do you do so and ensure your safety if there is a danger of the fire hooking under/around you?
  • Are there adequate safety zones and escape routes? Review what constitutes an adequate safety zone and escape route. Who has the responsibility to designate them and monitor their continued suitability?
  • Can you develop your starting point into an anchor point? List some effective anchor points. Describe how you would develop your starting point into an anchor point.
  • Have you posted lookouts? Where should they be posted? Can they see the main fire? Describe the qualities of a skilled lookout?
  • Do you have effective communications? Who do you need to be in contact with? If there are problems with communications, what can you do to improve them?
  • To reduce risk, evaluate several locations before making a decision. Talk about fires where you have had to relocate the line because your anchor point did not hold the fire.
  • How have you mitigated Watch Out Situation #8 in the past?

 

Last Modified / Reviewed:


Have an idea or feedback?

Share it with the NWCG 6MFS Subcommittee
 


Follow NWCG on X and Facebook
 


 

NWCG Latest Announcements

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508

WFSTAR 2025 Core Component Module Package and 2024 Fire Year in Review Now Available

Date: March 14, 2025
Questions?  Please contact:
Joe Schindel at mschindel@blm.gov
 

The 2025 Core Component Module Package for RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) and the 2024 Fire Year in Review are now available on the NWCG website. The 2025 Core Component Module Package provides all content needed to deliver RT-130.

References:

2025 Core Component Module Package

2024 Fire Year in Review Module

NEW! NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053

Date: March 12, 2025
Contact: Wildland Urban Interface Mitigation Committee

The NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 provides mitigation practitioners at all experience levels with recommendations on the most effective and efficient ways to accomplish mitigation work in communities at risk to wildfire damage or destruction. The content in this guide was written in coordination with the NWCG Standards for Mitigation in the Wildland Urban Interface, PMS 052.

References:

NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430