Skip to main content

Constructing Line Without a Safe Anchor Point

8. Constructing line without safe anchor point. A red fire engine is located inside a burned area with flames all around it while a firefighter sprays water from a hose at some of the flames.

An anchor point is an advantageous location, usually a barrier to fire spread, from which to start constructing a fireline. This Watch Out depicts an engine crew working along the fire edge without a clear anchor point.

Read about all 18 Watch Out Situations.

When deciding where to build a fireline, the following considerations must be weighed:

  • Can you hold the line? How do you do so and ensure your safety if there is a danger of the fire hooking under/around you?
  • Are there adequate safety zones and escape routes? Review what constitutes an adequate safety zone and escape route. Who has the responsibility to designate them and monitor their continued suitability?
  • Can you develop your starting point into an anchor point? List some effective anchor points. Describe how you would develop your starting point into an anchor point.
  • Have you posted lookouts? Where should they be posted? Can they see the main fire? Describe the qualities of a skilled lookout?
  • Do you have effective communications? Who do you need to be in contact with? If there are problems with communications, what can you do to improve them?
  • To reduce risk, evaluate several locations before making a decision. Talk about fires where you have had to relocate the line because your anchor point did not hold the fire.
  • How have you mitigated Watch Out Situation #8 in the past?

 

Last Modified / Reviewed:

Have an idea or feedback?

Share it with the NWCG 6MFS Subcommittee.


Follow NWCG on Twitter and Facebook

NWCG Latest Announcements

Incident Position Standards and the Next Generation Position Task Books Now Available for DMOB, DOCL, and RESL

Date: February 28, 2025
Contact: Incident Operations Subcommittee

NWCG is excited to announce that Incident Position Standards and the Next Generation Position Task Books are now available for Demobilization Unit Leader (DMOB), Documentation Unit Leader (DOCL), and Resources Unit Leader (RESL).

The Performance Support Packages for these positions, including a job aid for RESL, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their respective roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Demobilization Unit Leader Position Page 

NWCG Documentation Unit Leader Position Page 

NWCG Resources Unit Leader Position Page 

Next Generation Position Task Book and Updated Incident Position Description Now Available for Operations Section Chief Complex

Date: February 27, 2025
Contact: Incident Operations Subcommittee

NWCG is excited to announce that Operations Section Chief Complex (OSCC) has a Next Generation NWCG Position Task Book for Operations Section Chief Complex (OSCC), PMS 311-108 and an updated Incident Position Description.

These resources support trainees, qualified personnel, and evaluators in their respective roles.

References:

NWCG Operations Section Chief Complex Position Page 

NWCG Operations Section Chief Complex Incident Position Description 

NWCG Position Task Book for Operations Section Chief Complex (OSCC), PMS 311-108 

2025 NWCG Incident Response Pocket Guide (IRPG), PMS 461, Now Available

Date: February 27, 2025
Contact: Incident Operations Subcommittee

NWCG is excited to announce that the 2025 NWCG Incident Response Pocket Guide (IRPG), PMS 461, is now available. Visit NWCG's website to learn about the major updates and changes in the 2025 version of the IRPG. The NWCG Guia de Respuesta de Incidente de Bolsillo (GRI), PMS 461-ES is available electronically and will be available from Great Basin Cache by early summer 2025.

All hard copy materials, including the IRPG, are ordered through the Great Basin Cache (GBK). Information on the ordering process can be found in the National Fire Equipment System (NFES) Catalog.

References:

2025 IRPG Information 

NWCG Incident Response Pocket Guide (IRPG), PMS 461 

NWCG Guia de Respuesta de Incidente de Bolsillo (GRI), PMS 461-ES 

NWCG NFES Catalog - Part 2: Publications, PMS 449-2 

2025 Professional Reading Program

Date: February 18, 2025
Contact: Wildland Fire Leadership Development Program (WFLDP)

The Wildland Fire Leadership Development Program is announcing the 2025 Professional Reading list! The goal of the annual reading list is to promote the reading and discussion of the books throughout the year.

The five books chosen for this year are: Surf When You Can by Brett Crozier, Man’s Search for Meaning by Viktor E. Frankl, Elephant Company by Vicki Constantine Croke, Simply Managing by Henry Mintzberg, and Chop Wood Carry Water by Joshua Metcalf.

References:

Professional Reading Program