Skip to main content

Initial Attack Sizeup/Safety

Having a good sizeup is important to give both the Incident Commander (IC) and Fire Management Officer (FMO) a good idea of existing problems and what resources may be needed for effective firefighting.

Use the following reporting factors for sizeup and reference local fire sizeup cards.  Discuss others that may be used.

  • Fire name and location.
  • Terrain (slope, aspect, elevation) and position of fire on the slope.
  • Size of fire.
  • Fuel type, anticipated control problems, and spread potential.
  • Values threatened.
  • Weather conditions (wind speed and direction).
  • Fire behavior.
  • Resources on the fire and those needed.
  • Estimated containment and control times.
  • Cause (known, suspected, under investigation).

After your initial sizeup of the fire and/or transition from an initial attack IC, answer the following questions. Repeat this analysis whenever there is a change, or predicted change, in conditions on the fire.

  • Have you sized up the fire and relayed the information to dispatch?
  • Is the observed fire weather consistent with the forecast?
  • Can you control the fire with the resources available (on the incident or en route) and under the expected conditions?
  • Have you developed a plan to attack the fire (direct or indirect, anchor points, escape routes, head or flank attack, priority areas)? Have you communicated this information to all personnel assigned to the incident, including new arrivals?
  • Are lookouts in place or can you see the whole fire area?
  • Can you communicate with everyone on the fire and with dispatch?
  • Are escape routes and safety zones established? If you are using the black, is it completely burned and without a reburn potential?
  • Are safety and the 10 Standard Firefighting Orders being followed and/or mitigated?
  • Do you have a complete list of what resources have been ordered for the fire?
  • Will you control the fire before the next operational period? If you won’t, or the size of the organization exceeds the IC’s capability to manage, have you informed the agency FMO or Duty Officer (DO)?

Last Modified / Reviewed:


Have an idea or feedback?

Share it with the NWCG 6MFS Subcommittee
 


Follow NWCG on X and Facebook
 


 

NWCG Latest Announcements

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508

WFSTAR 2025 Core Component Module Package and 2024 Fire Year in Review Now Available

Date: March 14, 2025
Questions?  Please contact:
Joe Schindel at mschindel@blm.gov
 

The 2025 Core Component Module Package for RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) and the 2024 Fire Year in Review are now available on the NWCG website. The 2025 Core Component Module Package provides all content needed to deliver RT-130.

References:

2025 Core Component Module Package

2024 Fire Year in Review Module

NEW! NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053

Date: March 12, 2025
Contact: Wildland Urban Interface Mitigation Committee

The NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 provides mitigation practitioners at all experience levels with recommendations on the most effective and efficient ways to accomplish mitigation work in communities at risk to wildfire damage or destruction. The content in this guide was written in coordination with the NWCG Standards for Mitigation in the Wildland Urban Interface, PMS 052.

References:

NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430