Preparedness Level (PL) 5 Watch Outs

Preparedness levels are established locally, geographically and nationally to indicate that there are ongoing major incidents and potential to exhaust, or have exhausted, all agency fire resources. There are a number of factors which exist at this preparedness level that have the potential to impact firefighter safety:

  • Most or all levels of the fire management organization are operating at maximum capacity or even in crisis mode.
  • The incident support system is maxed out.
  • Resources needed to accomplish incident objectives are unavailable.
  • Fatigue is impacting individuals at all levels of the organization.
  • There is a sustained high operational tempo.

We must be mindful that these conditions reduce our margin for error.  The decisions we make have the potential to further reduce that margin, or to increase our capacity to cope with uncertainty.

Read this scenario and imagine that you are in a similar situation.

It is PL5 and you are on a rapidly growing Type 3 incident. There sources on the incident can’t keep up with the demands of the fire. An Incident Management Team (IMT) has been ordered but is not expected to arrive for multiple days. An engine crew has exceeded their 2:1 work/rest ratio for 3 days straight and is now overly fatigued, mentally and physically. The crew works a full day shift prepping line with chainsaws for the night shift’s planned burn operations.

The engine is a part of a task force responsible for completing a back burn and holding the line without the ability to bring in extra resources if things don’t go as planned. The engine crew consists of an Engine Boss (ENGB), an experienced assistant, a first-year crew member, and a local fuels tech with more than four years of fire experience but not as a primary firefighter. The assistant is involved in the burn and is working for the Firing Boss (FIRB), leaving the ENGB and two crew members to help with holding. Unfavorable winds during the night burn cause the firefighters to take smoke all night.

About six hours into the burn, the ENGB is faced with a decision. The task force needs a Heavy Equipment Boss (HEQB). As a trainee HEQB and the only available option, the ENGB is asked to leave the engine and provide direction to a dozer. At this point the ENGB takes a tactical pause to think about the timeline that got them to this point.

  • Scenarios like this are not uncommon during PL 5; we operate at high tempos for long durations often with narrow margins for safety. Take this time to discuss how you could create margin in this situation or share a personal story where you were stretched operationally and what you did.
  • Do we adjust our tactics during PL5 knowing it is unlikely we will get any additional resources?
  • Are there other circumstances when conditions like PL5 can occur?
  • What practices can you use to cope with the increase of expectations and operational tempo during PL 5 conditions?

Last Modified / Reviewed:


Have an idea or feedback?

Share it with the NWCG 6MFS Subcommittee
 


Follow NWCG on X and Facebook
 


 

NWCG Latest Announcements

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508

WFSTAR 2025 Core Component Module Package and 2024 Fire Year in Review Now Available

Date: March 14, 2025
Questions?  Please contact:
Joe Schindel at mschindel@blm.gov
 

The 2025 Core Component Module Package for RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) and the 2024 Fire Year in Review are now available on the NWCG website. The 2025 Core Component Module Package provides all content needed to deliver RT-130.

References:

2025 Core Component Module Package

2024 Fire Year in Review Module

NEW! NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053

Date: March 12, 2025
Contact: Wildland Urban Interface Mitigation Committee

The NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 provides mitigation practitioners at all experience levels with recommendations on the most effective and efficient ways to accomplish mitigation work in communities at risk to wildfire damage or destruction. The content in this guide was written in coordination with the NWCG Standards for Mitigation in the Wildland Urban Interface, PMS 052.

References:

NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430