Managing Vehicle Traffic in Smoke

Smoke has the potential to cause safety hazards to vehicle traffic in the vicinity of active fires, both wildland and prescribed fires, especially at night. The following traffic-related items should be considered and addressed in local unit planning documents prior to an incident/project.

  • Identification, location, and phone numbers of local units that have law enforcement and traffic control responsibilities in the smoke-impacted areas. Review any local agreements presently in place with those agencies.
  • Identification of important public roads that may be impacted by smoke.
  • Identification of adequate equipment and trained personnel to control traffic. This may include warning signs, communications equipment (preferably not using the active fire frequency), and vehicles equipped with warning or flashing lights.
  • Identification and phone numbers of radio and television stations that can issue traffic advisories for the smoke-impacted area.
  • Identification of alternative traffic routes as part of the incident/project traffic plan.
  • Identification of traffic routes subject to temperature inversions, as well as contributory factors such as fog and ice.
  • When potential smoke-related problems are identified:
    • Advise the Incident Commander, Burn Boss, or Agency Administrator that severe smoke exists.
    • Notify local law enforcement units and highway departments of a potential problem.
    • Implement preplanned actions such as posting smoke warning signs.
    • Ensure that proper equipment is ready and appropriate personnel are briefed on contingency plans and are available to control traffic.

 

Category

Last Modified / Reviewed:


Have an idea or feedback?

Share it with the NWCG 6MFS Subcommittee
 


Follow NWCG on X and Facebook
 


 

NWCG Latest Announcements

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508

WFSTAR 2025 Core Component Module Package and 2024 Fire Year in Review Now Available

Date: March 14, 2025
Questions?  Please contact:
Joe Schindel at mschindel@blm.gov
 

The 2025 Core Component Module Package for RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) and the 2024 Fire Year in Review are now available on the NWCG website. The 2025 Core Component Module Package provides all content needed to deliver RT-130.

References:

2025 Core Component Module Package

2024 Fire Year in Review Module

NEW! NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053

Date: March 12, 2025
Contact: Wildland Urban Interface Mitigation Committee

The NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 provides mitigation practitioners at all experience levels with recommendations on the most effective and efficient ways to accomplish mitigation work in communities at risk to wildfire damage or destruction. The content in this guide was written in coordination with the NWCG Standards for Mitigation in the Wildland Urban Interface, PMS 052.

References:

NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430