Skip to main content

SEAT Coordinator

Position Description

Duties

  • Performs as a liaison between the agency and the SEAT bases of operations. Reports directly to the Bureau of Land Management State Aviation Manager (SAM) or United States Forest Service Regional Aviation Officer (RAO), when assigned to a specific area of responsibility.
  • Performs base inspections in the field, using standard SEAT Base inspection form. Provides assistance in rectifying any discrepancies, offers recommendations for more efficient operation.
  • Performs area inventory of possible remote SEAT bases. Compiles a listing of each prospective base of operations, listing the locations, local contacts and phone numbers, latitude and longitude, length, width, and composition of the landing surface. Provides descriptions of all facilities and identifies those that would be available for use by agency for SEAT operations. Lists phone numbers of possible water tenders available locally.
  • Initiates agreements, when possible, between airport authorities and the agencies for use of facilities needed at location. Provides procurement officer with information and contacts of possible vendors. (SECO does not have the authority to procure any vendors or to make any agreement for rental or lease.)
  • Performs evaluation in the field of the SEAT Manager (SEMG) and the base operation.
  • Performs evaluations, in conjunction with the SEMG and unit aviation officer, of the SEAT vendor pilot and support operations.
  • Assists agency unit aviation officer with deployment and movement of SEAT resources. Including recommendations on types of resources to be deployed (M-18 vs. AT802).
  • Compiles a comprehensive report on SEAT operations, within the area of operations as assigned. Offers recommendations for improvement. This report is to be delivered to the Contracting Officers’ Representative (COR) and the SAM or RAO, with a copy also going to the National SEAT Program Manager.
  • Has the authority to “sign off” specific tasks within the guidelines of the SEMG Task Book.

Position Knowledge and/or Requirements

  • Qualification Prerequisites:
    • Must be a qualified and current SEMG with a minimum of five (5) years of experience as SEMG.
    • Must be qualified and current as Strike Team Leader.
    • Must be qualified and current as either Airtanker Base Manager, OR Fixed-Wing Base Manager, OR Helicopter Manager, OR Air Support Group Supervisor or above.
  • Experience Requirements:
    • Must have successfully performed as SEMG.
    • Must have successfully performed as a trainee SECO, under the direct supervision of a current and qualified SECO.

 

Last Modified/Reviewed:

NWCG Latest Announcements

NWCG Standards for Rapid Extraction Module Support, PMS 552

Date: July 10, 2024
Contact: Incident Medical Unit Subcommittee 

A new publication from the Incident Medical Unit Subcommittee is now available. The NWCG Standards for Rapid Extraction Module Support, PMS 552 will be used as a guide and as an opportunity to begin to build out Rapid Extraction Module Support (REMS) modules for the remainder of Fire Year 2024. These standards will be fully implemented as the minimum standard starting in January 2025.

NWCG Standards for Rapid Extraction Module Support outlines the roles, duties, qualifications, and equipment pertinent to REMS. A REMS team, strategically stationed at wildland fires, plays a pivotal role in prioritizing swift access and medical treatment to injured or ill firefighters for safe and efficient egress off the fireline. This ensures their rapid transport to definitive medical care in cases of emergency during firefighting operations, highlighting the invaluable contribution of the REMS team to firefighter safety and well-being.

References:

NWCG Standards for Rapid Extraction Module Support, PMS 552

National Wildland Firefighter Day

Date: July 2, 2024
Contact: National Interagency Fire Center 

The National Wildfire Coordinating Group (NWCG) would like to recognize July 2, 2024, as National Wildland Firefighter Day (NWFFD). Established in 2022, NWFFD honors the dedication of wildland firefighters and support personnel. This day falls within the 2024 Week of Remembrance (June 30 - July 6), providing an opportunity to renew our commitment to wildland firefighter safety while remembering those who have fallen in the line of duty.

NWCG continues to provide leadership to enable interoperable wildland fire operations among federal, state, local, Tribal, and territorial partners. NWCG standards and training establish common practices to contribute to safe, effective, and coordinated national interagency wildland fire operations.

References:

NWCG.gov

Week of Remembrance

National Wildland Firefighter Day

2024 Week of Remembrance

Date: June 27, 2024
Contact: 6 Minutes for Safety Subcommittee 

As we approach the 2024 Week of Remembrance (WOR), June 30 to July 6, we dedicate this time to thoughtfully reviewing and recognizing the events of the 2018 Mendocino Complex. As such, this year’s theme of “Learning From the Mendocino Complex” embodies a longstanding hallmark of WOR, honoring through learning.

Throughout the week, our energy will be directed toward fostering generative conversations in briefing rooms and at tailgates.

References:

6 Minutes for Safety - 2024 Week of Remembrance

Wildland Fire Lessons Learned Center

Updated NWCG Wildland Fire Risk and Complexity Assessment, PMS 236

Date: June 24, 2024
Contact: Incident and Position Standards Committee 

The June 2024 update of the NWCG Wildland Fire Risk and Complexity Assessment, PMS 236, is now available to meet the current needs for incident management typing.

The NWCG Wildland Fire Risk and Complexity Assessment should be used to evaluate firefighter safety issues, assess risk, and identify the appropriate incident management organization based on incident complexity. Assessing risk, determining incident complexity, and identifying an appropriate incident management organization is a subjective process based on examining a combination of indicators or factors, which can change over time.

References:

NWCG Wildland Fire Risk and Complexity Assessment, PMS 236