Skip to main content

Position Naming Board

Banner Image
PNB header graphic.  Decorative.
Mission Statement

Mission Statement

The Position Naming Board (PNB) provides national leadership to maintain incident management position title and mnemonic consistency throughout the wildland fire community.

Body

photo of firefighters with forest burning in the background. Decorative.Primary Objectives

  • Establish business rules and processes for managing the position list in the system of record.
  • Maintain definitions of titles and associated mnemonics.

Request for Change

The NWCG Position Naming Board (PNB) is the authority for the approval of all position codes and position titles assigned for each position for incident management mobilization that are utilized by the wildland fire community. All position codes and position titles additions or modifications must be PNB approved prior to utilization in the national mobilization system.

Use PNB Request for Change Form to submit the following:

  1. Request new position title and position code
  2. Modification to existing position title and/or position code
  3. Notify of inactivation of an existing position

Process

All change requests must be submitted via the online request form.

All position code and position title requests submitted to the PNB for consideration must adhere to the NWCG PMS Data Standards for Position Codes and Position Titles.

All requests must be validated by the submitter's Incident and Position Standards Committee (IPSC) agency representative to ensure the request meets the need of the agency.

  • Requests submitted directly to the PNB prior to IPSC agency representative validation will be sent to the representative for validation. No action by the PNB will occur until validated/approved by the representative.
  • Requests submitted to the PNB by an IPSC agency representative is assumed to be agency validated and will be addressed by the PNB at the next scheduled meeting. 

Requests will only be addressed at the next scheduled PNB quarterly meeting due to impacts to the qualification and ordering systems. Quarterly meetings (March, June, September, December) occur on the third Thursday of the month.

Once a decision has been reached, the PNB chair will inform the requester of the decision and document the decision on the RFC form.

Instructions

  1. Email Address: Enter the email address of the person submitting the request.
  2. Requesting Change Select the appropriate agency or select the NWCG Committee requesting the change. For the selection of State or NWCG Committee, indicate which one at the next screen.
  3. Requester Information Please provide the name, agency, home unit, and telephone number of the person initiating the request so the board may make contact for additional information, if necessary.
  4. Request Type
    • New position: Enter requested new position title and position code
    • Change to existing title and/or code: Identify current position and identify requested change.
    • Inactivation of existing position: Identify position requested to be inactivated and the effective date.
  5. Description of the Proposal
    • Position Description: Detailed description of the positions duties and responsibility when assigned to an incident.
    • Description of Issue and Reason for Change: Describe the issue the proposal is intended to address or reason for the change.
    • Qualification Guides and Systems Affected: Identify the qualification documents and the applications that will be affected.
    • Supporting Documents: Is there supporting documentation that needs to be submitted to support request? If yes, submitter will be contacted for the document(s) after request is submitted. 

Position List (Mnemonics)

The position list represents all PNB approved positions being, or have been, utilized by the wildland fire community for incident management mobilization.

Chair: Gina Papke

NWCG Coordinator: Lamb, Erica

Parent Committee: Incident and Position Standards Committee

Meeting Schedule: Quarterly on the 3rd Thursday (March, June, Sept, Dec)

Page Last Modified or Reviewed:

NWCG Latest Announcements

ETC Equipment Bulletin: 25-003 Flame-Resistant Shirt Survey

Date: June 12, 2025
Questions?  Please contact:
Equipment Technology Committee

The U.S. Forest Service National Technology and Development Program (NTDP) is seeking input on the Forest Service-designed flame-resistant (FR) shirt, currently available through the National Interagency Support Cache system and FedMall.

NTDP is conducting a product review to improve future FR shirt designs. As part of this effort, a short survey is now open for federal employees who have worn any of three recent FR shirt models. Feedback will guide design improvements to better meet the needs of wildland firefighters.

To comply with the Paperwork Reduction Act, responses are limited to federal employees. The survey is open through September 12, 2025. 

References:

NWCG Alerts

ETC Equipment Bulletin: 25-003

NEW! S-130, Firefighter Training (Blended) Now Available

Date: June 10, 2025
If you have questions, please visit our FAQ page. 
If your question is not answered there, you can 
submit your question using our Contact Us form. 
 

The S-130, Firefighter Training (Blended), equips new wildland firefighters with essential skills through a mix of online learning and hands-on training. The course features a required online component and an instructor-led exercise, reinforcing online concepts with practical performance-based training.

The course builds competencies in wildland fire operations, safety, and equipment use, applicable across various operational environments. Both the online component and instructor-led field exercise must be completed to receive a certificate of completion. Students are required to finish the prerequisite S-190, Introduction to Wildland Fire Behavior, before enrolling in S-130, Firefighter Training (Blended).

References:

S-130, Firefighter Training (Blended)

S-190, Introduction to Wildland Fire Behavior

Wildland Fire Learning Portal

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

Date: June 3, 2025
Questions?  Please contact:
Emergency Medical Committee

The Emergency Medical Committee has issued interim guidance for Rapid Extraction Module Support (REMS) teams. Until further notice, Type I and II REMS teams must designate a team leader qualified at Firefighter Type 1 Squad Boss (FFT1) or higher. This temporary change replaces the Single Resource Boss (SRB) requirement, which is currently not feasible due to administrative barriers.

This memorandum does not include any other changes to the NWCG Standards for Rapid Extraction Module Support, PMS 552. This interim change takes effect immediately and will remain in place until further notice.

References:

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

NWCG Standards for Rapid Extraction Module Support, PMS 552

Equipment Bulletin 25-002: Chaps, Chain Saw, M-2020, Nonconformities Affecting Use, Appearance, and Serviceability

Date: June 2, 2025
Questions?  Please contact:
Equipment Technology Committee

The Equipment Technology Committee issued Equipment Bulletin: 25-002 to address a manufacturing nonconformity affecting Forest Service specification, 6170-4K Chain Saw Chaps. The issue applies to chaps manufactured in 2024 and 2025 and distributed through FedMall. These chaps may have incorrectly bound edges that expose inner protective layers.

Independent purchasers should inspect all chain saw chaps received from FedMall beginning in 2024, prior to use. Review the full Equipment Bulletin: 25-002 for inspection criteria and recommended actions.

References:

NWCG Alerts

ETC Equipment Bulletin: 25-002