Skip to main content

PMS 448

Cord – Light, 50', with Multiple Light Sockets, AWG, 12/3 Wire

NFES #
000563
Category
Camp
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Visually inspect for broken plugs, cracked or damaged cord, cracked or damaged sockets, bent or broken bulb guards.
  2. Dispose of or repair if bulb guards are bent or missing.
  3. Replace any cracked or broken light sockets.
  4. Dispose of any broken, frayed, or burned cords.
  5. Dispose of any cords that are not UL approved with a 12/3 gauge minimum wire.
  6. Return to stock if item is unused.
  7. Refurbish item if has been used or damage is repairable.

Refurbishing Procedures

A. Repair

  • Repair or replace guards.

B. Cleaning

  1. Wipe down cord with a mild detergent solution to remove mud, dirt, and grease.
  2. Clean guards with soapy water, brush, and scouring pad.
  3. Do NOT soak.
  4. Dry completely before use (due to possible electric shock).

C. Testing for Performance

  • Plug cord into 110v source and test each socket by screwing in a bulb or testing with voltage tester at cache option.

D. Repackaging

  • Local cache option for coiling and repacking.

 

NWCG Latest Announcements

ETC Bulletin 25-001: Retrofitted Hot/Cold Beverage Kits - 2025 Field Season

Date: April 16, 2025
Questions?  Please contact:
Equipment Technology Committee

Due to spout failures and the associated risk of burn injuries, manufacturers have retrofitted the Hot/Cold Beverage Kits using a heat-shrinking band to secure the black spout at the insertion site. The updated kits feature a fluorescent label on each full kit assembly for easy identification. Catering units are encouraged to confirm the clear heat-shrinking bands are intact around each spout before filling.

ETC Bulletin 24-001 regarding Hot/Cold Beverage Kits has been archived and replaced by ETC Bulletin 25-001 for the 2025 season.

References:

NWCG Alerts

ETC-EB-25-001 Retrofitted Hot/Cold Beverage Kits

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412