Skip to main content

PMS 448

Fly – Tent, Type II, 9’ x 10’

NFES #
001521
Category
Camp
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Visually inspect for rips and tears to body of fabric larger than pinholes. Inspect borders for seam damage and missing or loose grommets
  2. Return to stock if item is clean and appears to be in unused condition.
  3. Refurbish item if it is easily and economical done.
  4. Dispose if item is not to specification, or is not economically feasible to refurbish.

Refurbishing Procedures

A. Cleaning

  1. Unfold and look for defects.
  2. Sweep or brush off with stiff broom or brush.
  3. Wash with water and mild degreaser detergent.
  4. Rinse to remove all soap residues.
  5. Air dry.
  6. If items are taken to vendor laundry facilities for refurbishment; ensure that they receive a copy of this refurbishment standard. The laundry facility must satisfy both--the requirements as set by the manufacturer specification and the agreement made with the local agency.

B. Repair

  • None

C. Testing for performance

  • None

D. Repackaging

  • Package 20 each in NFES #002006 carton (23” x 19” x 10”).

 

NWCG Latest Announcements

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508

WFSTAR 2025 Core Component Module Package and 2024 Fire Year in Review Now Available

Date: March 14, 2025
Questions?  Please contact:
Joe Schindel at mschindel@blm.gov
 

The 2025 Core Component Module Package for RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) and the 2024 Fire Year in Review are now available on the NWCG website. The 2025 Core Component Module Package provides all content needed to deliver RT-130.

References:

2025 Core Component Module Package

2024 Fire Year in Review Module

NEW! NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053

Date: March 12, 2025
Contact: Wildland Urban Interface Mitigation Committee

The NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 provides mitigation practitioners at all experience levels with recommendations on the most effective and efficient ways to accomplish mitigation work in communities at risk to wildfire damage or destruction. The content in this guide was written in coordination with the NWCG Standards for Mitigation in the Wildland Urban Interface, PMS 052.

References:

NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430