Skip to main content

Container – Fuel/Oil, 2 Compartment, with CARB* Compliant Nozzles

NFES #
000741
Category
Fuel Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for fuel or oil in container.  If any, dispose of fuel and oil properly.
  2. Inspect for leaks or separation along seams.  Dispose of container if any are present.
  3. Inspect inside of container for any foreign matter that cannot be removed or identified.  Dispose of container if this has occurred
  4. Inspect container for proper fuel geyser labeling.
  5. Inspect all threads, moving parts, locking mechanism, auto-shut valve or spring mechanism on both (2) nozzles for serviceability.  If nozzle does not spring to closed position when not pouring, dispose of.
  6. Certain nozzles are supplied with a dust cap.  The dust cap does not have to be present for the container to be “ready for issue”.  Ensure there is a gasket present on the lip of the nozzle and it is not damaged.  The gasket and auto-shut valve in the nozzle actually seals the container.
  7. Return to stock if item does not show any signs of use and passes visual inspection.
  8. Refurbish if item has been used and/or damage is repairable.

Refurbishing Procedures

A. Cleaning

  1. Drain all existing fuel or oil.
  2. Wash container inside and out with mild detergent with brush/scouring pad or power wash.
  3. Rinse thoroughly.
  4. Use rag and air hose or other means to dry the container interior.
  5. Turn upside down with lids off or open and let air dry.

B. Repair

  1. Replace nozzle gaskets if stiff, damaged or missing.
  2. Assemble both nozzles to unit to ensure nozzle-collar threads fit.
  3. Replace nozzles as needed with nozzles that automatically spring to closed position (CARB compliant style).
  4. Replace fuel geyser label if missing.  Best adhesion is occurring by wiping the plastic surface with isopropyl alcohol drying completely before placing the sticker.  Light use of a heat gun accompanied by firm rubbing of the sticker improves adhesion.

C. Testing for Performance

  • None

D. Repackaging

  • Local cache option.

NWCG Latest Announcements

ETC Bulletin 25-001: Retrofitted Hot/Cold Beverage Kits - 2025 Field Season

Date: April 16, 2025
Questions?  Please contact:
Equipment Technology Committee

Due to spout failures and the associated risk of burn injuries, manufacturers have retrofitted the Hot/Cold Beverage Kits using a heat-shrinking band to secure the black spout at the insertion site. The updated kits feature a fluorescent label on each full kit assembly for easy identification. Catering units are encouraged to confirm the clear heat-shrinking bands are intact around each spout before filling.

ETC Bulletin 24-001 regarding Hot/Cold Beverage Kits has been archived and replaced by ETC Bulletin 25-001 for the 2025 season.

References:

NWCG Alerts

ETC-EB-25-001 Retrofitted Hot/Cold Beverage Kits

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412