Skip to main content

PMS 448

Rack – Collapsible

NFES #
000659
Category
Tools
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for damaged/missing tines, if so dispose of.
  2. Inspect for damage to handle sliding-locking mechanism.
  3. Inspect all welds to see if cracked or broken.
  4. Inspect grips for tears/loss of grips.
  5. Inspect nuts and bolts to make sure they are in place (2 each).
  6. Inspect pin in locking mechanism.
  7. Return to stock if item passes inspection and shows no sign of use.
  8. Dispose of item if it is damaged beyond repair.
  9. Refurbish item if economically repairable.

Refurbishing Procedures

A. Cleaning

  1. Damp wipe with mild detergent solution to remove dirt, mud, and grease.
  2. Let stand and dry.
  3. Lubricate slide mechanism with WD 40 or similar solution.

B. Repair

  1. Repair/replace nuts, bolts, and pins as needed. Various nuts, bolts, and locking pins may be procured at a local hardware store.
  2. Replace rubber handles.

C. Testing for Performance

  1. Inspect slide mechanism to see if moves freely and does not bind up when expanding tines of rake.
  2. Expand all tines to see if secure and stable.

D. Repackaging

  • Place 10 each in carton NFES #000338 (37” x 18” x 7”).

 

NWCG Latest Announcements

Updated NWCG Standards for Water Scooping Operations, PMS 518

Date: December 19, 2024
Contact: Water Scooper Operations Unit

The NWCG Standards for Water Scooping Operations, PMS 518 establishes the standards for dispatching, utilizing, and coordinating water scooping aircraft on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, and any local, state, or geographic/regional water scooping plans.

References:

NWCG Standards for Water Scooping Operations, PMS 518

Updated NWCG Standards for Aerial Supervision, PMS 505

Date: December 19, 2024
Contact: Interagency Aerial Supervision Subcommittee

The Interagency Aerial Supervision Subcommittee has updated the NWCG Standards for Aerial Supervision, PMS 505. PMS 505 establishes standards for aerial supervision operations for national interagency wildland fire operations. 

References:

NWCG Standards for Aerial Supervision, PMS 505

New Job Aids Available: Packing Lists for Wildland Fire Fireline Personnel and Support Staff, J-101 and J-102

Date: December 3, 2024
Contact: NWCG TRAINING

Two new job aids are now available: Packing List for Wildland Fire Fireline Personnel, J-101 and Packing List for Wildland Fire Support Personnel, J-102, should serve as a baseline for items needed on a wildland fire assignment. These lists will help personnel prepare for a 14 to 21-day assignment on the fireline or in a support role.

References:

Job Aid Catalog

NWCG Packing List for Wildland Fire Fireline Personnel, J-101

NWCG Packing List for Wildland Fire Support Staff, J-102

NWCG Equipment Technology Committee Releases Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention

Date: November 14, 2024
Contact: Equipment Technology Committee

The Equipment Technology Committee (ETC) has released Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention. Misaligned toolless fuel caps on Stihl chainsaws have led to recurring fuel spillage, fuel ignition, and burn injuries during wildland fire management operations.

This Safety Warning is intended to highlight the details and recommended procedures for the installation of a Stihl chainsaw toolless fuel cap, as well as how to identify and correct a misaligned, damaged, or broken fuel cap to help prevent fuel spillage.

References:

NWCG Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention

Advertencia de equipos 24-001: Prevención de derrames de la tapa de combustible sin herramientas de la motosierra Stihl

NWCG Alerts