This source list is compiled from federal, state, and municipal governments, military, and emergency medical response (EMS) and/or extraction programs throughout the country. This list can be useful when filling in the Emergency Contact Checklist on the NWCG Aviation Mishap Response Guide and Checklist, PMS 503

Emergency helicopter extraction is used to insert emergency response personnel and/or extract critically injured personnel from remote or inaccessible locations. Incident management and coordination system personnel should take the time to understand the capabilities and limitations of helicopter extraction. Read the background and consideration information below, including ordering resources and mission planning. 

The Interagency Emergency Helicopter Extraction Source List, PMS 512, is developed and maintained by the NWCG National Coordination System Committee (NCSC) in collaboration with the National Interagency Aviation Committee (NIAC), entities of the National Wildfire Coordinating Group (NWCG). While previous versions may contain relevant or useful information, the GSTOP is obsolete. The user of this information is responsible for confirming that they have the most up-to-date version. NWCG is the sole source for the publication. 

Comments, questions, and recommendations shall be submitted to the appropriate agency member assigned to the NCSC. View the complete rosterSubmit changes for review and approval by geographic area representatives. 

Ordering Resources

Careful consideration should be given by the on-scene Incident Commander (IC) and/or Emergency Medical Services (EMS) personnel prior to making the determination to request and initiate the use of the following resources.

Most of the aircraft on the source list are not inspected/carded nor approved by a USFS, or DOI Cooperator Aircraft Letter of Approval. These non-approved aircraft do not have current procurement agreements with the federal agencies and therefore cannot be directly ordered from the vendor.

Contract aircraft that are federally carded and approved for short-haul, or cooperator aircraft by a letter of approval, may be used exclusively (on standby) for an incident through normal dispatch/helibase ordering procedures.

Process for activation of military aircraft may vary from state to state. There may be delays in response.

Aircraft that have not been inspected, carded, or approved by a Cooperator Aircraft Letter of Approval for agency use shall not be placed on standby for a federal incident. It may be ordered through the emergency “911” system as approved by the appropriate IC or Line Officer.

An emergency helicopter request should be initiated and coordinated through local dispatch or Geographical Area Coordination Center (GACC).

For time critical or potential long term assignments request military, National Guard or Coast Guard extraction capable resources through the Air Force Rescue Coordination Center (ARFCC), phone #: 800-851-3051. It is their job to locate the closest asset to fulfill your emergency rescue needs. It is important to note resource availability may be limited due to military deployments or other factors, and response time may be 2-3 hours.

In some circumstances, orders for county/sheriff department owned aircraft can be placed directly or with the specified contact.

Additional Resource Information

Atlas & Database of Air Medical Services (ADAMS) 

Definitions

Rescue Hoist:

A cable winching device permanently mounted to the helicopter that is capable of lowering/raising persons attached to the cable.

Short-haul:

To transport one or more persons suspended on a fixed line (150’-250’) beneath a helicopter. The intent is to transport persons a short distance (short-haul), normally from a limited or inaccessible location to a safe landing area.

Updates and Source Verification

The NWCG National Interagency Aviation Committee (NIAC) intends to keep this document continuously updated. However, accuracy of source information can change due to unforeseen circumstances, and many factors may influence availability and response times. Users must verify source information accuracy based on individual needs and circumstances.

Note: If you find information that should be added, changed, or is missing from the source list, please make corrections on the blank source list template on the left menu or email to:

National Assistant Helicopter Operations Specialist
USDA-Forest Service

3833 S. Development Ave.
Boise, ID 83705-5398
Office (208) 387-5921
Fax  (208) 387-5735

EHE Mission Planning

The following information was compiled by the Intermountain Healthcare Life Flight Program, Salt Lake City, Utah, and is intended to assist those involved in mission planning for an emergency extraction.

Their website states, “A hoist rescue is a great tool for extracting patients from challenging environments; however, this type of operation does have some limitations. Good communication between the requesting agency and Life Flight is critical in creating a plan to best serve all agencies and the patient safely.”

For additional information, visit the Intermountain Healthcare Life Flight website

Minor revisions have been incorporated into the information to fit the audience.

Mission planning should begin with these types of questions:

  • What is the nature of the intended short-haul/hoist rescue?
  • What is the weather at the scene?
  • What do you want the rescuer to do?
  • What is the plan if the rescuer cannot complete the mission?
  • Patient information (i.e., location, mechanism of injury, condition, anyone with the patient, contact).
  • Is there a Command Post (location, IC contact, radio frequencies)?
  • Is SAR at the scene or deployed?
  • Is there a landing area (near the patient, near the Command Post)?
  • Where is the nearest location for jet fuel?
  • Is there anything else you want us to do before we leave the area?

Factors That Limit Hoist Operations:

  • Winds are greater than 20 mph, poor visibility, or severe weather.
  • If total weight of patient and equipment exceeds 450 lbs.
  • Hoist operations are not conducted at night.
  • Over water.

We may not be able to complete a short-haul/hoist mission if:

  • There are unresolved communications issues or safety problems.
  • Near dusk.
  • Patient location requires technical rescue.
  • There’s avalanche potential at patient location

Initial Short-Haul/Hoist Risk Assessment:

  • Life threatening injury or illness.
  • Time dependent injury.
  • Ground evacuation may endanger patient and/or other personnel.
  • Ground evacuation would be time consuming.
  • Ground evacuation is not possible.
  • No landing area near the patient.

TOMAS

Terrain: Alpine, forest, slope, snow, etc. When possible, establish a nearby alternate landing area.

Obstacles: Trees, cliffs, rock scree, loose debris, dust, wires, limited daylight, rotor wash, etc.

Method: Net, bag, litter, harnesses, tag line, etc. Logistics, type of insertion/extraction.

Alternatives: Standby and/or assist SAR with a ground rescue, land near victim.

Safety: Team reviews available information and identifies concerns. Determines “Go/No-Go” decision and justifies why.

 

NWCG Latest Announcements

NWCG Equipment Technology Committee Releases New Equipment Bulletins

Date: September 27, 2024
Contact: Equipment Technology Committee

The Equipment Technology Committee (ETC) has released three new Equipment Bulletins:

  • ETC-EB-24-003 Diesel exhaust fluid (DEF) in fuel containers.
  • ETC-EB-24-004 Two-compartment fuel and oil container (Dolmar) unavailable in the United States (US) and reminders for upkeeping current inventories.
  • ETC-EB-24-005 Personal Protective Equipment (PPE): Inspection, Care, and Maintenance.

These bulletins remind field going personnel of important issues related to equipment for wildland firefighting efforts.

References:

NWCG Alerts

ETC-EB-24-003 Diesel exhaust fluid (DEF) in fuel containers

ETC-EB-24-004 Two-compartment fuel and oil container (Dolmar) unavailable in the United States (US) and reminders for upkeeping current inventories

ETC-EB-24-005 Personal Protective Equipment (PPE): Inspection, Care, and Maintenance

The Experiential Learning Subcommittee is looking for your feedback on Staff Rides

Date: September 20, 2024
Contact: Ashleigh D'Antonio and George Risko, Leadership Committee

The Experiential Learning Subcommittee needs to hear from the field about where the greatest need lies regarding staff rides and their accessibility.

  • Do you have an event you would like to turn into a learning experience?
  • Do you have a staff ride built, but are struggling to implement the delivery?
  • Do you need help building capacity?
  • What other ideas do you have to support experiential leadership training?

Fill out this short survey below to help us help you.

References:

Staff Rides: Feedback

Staff Rides

Updated NWCG Single Resource Casual Hire Information, PMS 934

Date: September 19, 2024
Contact: Incident Business Committee

The Incident Business Committee has updated the NWCG Single Resource Casual Hire Information, PMS 934. This update expands the provisions for hiring emergency personnel.

References:

NWCG Single Resource Casual Hire Information, PMS 934

IBC Memorandum 24-03

NWCG 2024 Spring/Summer Highlights

Date: September 13, 2024

Image
Forest Service Logo
Image
Bureau of Indian Affairs Logo
Image
Bureau of Land Management Logo
Image
National Park Service Logo
Image
Fish & Wildlife Service Logo
Image
State Foresters Logo
Image
U.S. Fire Administration
Image
Intertribal Timber Council Logo
Image
International Association of Fire Chiefs
Image
Department of Defense Logo

Welcome to our latest highlights from the National Wildfire Coordinating Group, where we explore the latest updates, insights, and efforts that develop interoperable wildland fire operations among federal, state, local, Tribal, and territorial partners.

The Performance Support Package, which for ABRO includes the Incident Position Standards and Next Generation Position Task Book were developed through the Incident Performance and Training Modernization (IPTM) effort. The Performance Support Package will support trainees, those qualified in the position, and evaluators.
 


Image
NASA Logo

NASA JOINS NWCG!

The National Aeronautics and Space Administration (NASA) is officially an associate member of NWCG. As such, NASA is beginning to collaborate with wildland fire management agencies with the goal of increasing collaboration across agencies and leveraging NASA data, technology, and innovation for nation-wide efforts in wildland fire management. NASA has a rich history of research, development, and technology transfer in the areas of Earth science, space technologies, and aeronautics that support the NWCG mission.


Image
NWCG new website look.

WWW.NWCG.GOV HAS A NEW LOOK AND DESIGN

The NWCG web team dedicated the past two years to making a significant upgrade to the www.nwcg.gov site. This upgrade involved a comprehensive redesign of over 7,700 web pages.

The modernization of NWCG’s website involved migrating to Drupal 10, a cutting—edge content management system, and leveraging Amazon Web Service GovCloud for secure and efficient hosting. These upgrades help ensure that the NWCG website remains current in content management practices, offering enhanced customization, improved performance, and an overall superior user experience.


NWCG Leadership Committee

Image
WFLDP Professional Reading Program logo
Image
WFLDP PRP book covers

The Wildland Fire Leadership Development Program announced the Professional Reading Program’s 2024 list!

The years books include:

  • Young Men and Fire by Norman Maclean
  • The Wisdom of the Bullfrog by William H. McRaven
  • The Art of Clear Thinking by Hasard Lee
  • Emotional Agility by Susan David
  • Writing to Persuade by Trish Hall

Learn more at the NWCG Leadership Committee


INCIDENT PERFORMANCE AND TRAINING MODERNIZATION

In 2023, NWCG kicked off the Incident Performance and Training Modernization (IPTM) effort. A training system overhaul focused on developing a performance-based training system designed to shift training to on-the-job when appropriate.

Over the next five years, NWCG intends to analyze all positions within the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1. To date we are currently working on 30 incident positions, and planning for 20+ in calendar year 2025.

Subject Matter Experts from a variety of geographical areas and agencies recently completed the position analysis for 16 positions. From this analysis, Incident Positions Standards and a Next Generation Position Task Book will be developed for each position.

Image
Incident Performance and Training Modernization

NEXT GENERATION POSITION TASK BOOK

In April 2024, NWCG launched the new Next Generation Position Task Book (Next Gen PTB) which is a key component of the IPTM effort. This revised evaluation tool is designed to work in conjunction with the newly developed Incident Position Standards.

Major Next Gen PTB changes:

  • Structured to improve constructive conversations between evaluators and trainees.
  • Reference new Incident Position Standards.
  • Include only tasks required to be evaluated for successful performance.
  • Trainees will be rated on their performance vs. initialing whether a task was completed.
  • Must include written feedback when trainee does not meet the standard.
  • Will be position specific (no combined PTBs).
Image
Screen shot of the Next Gen Position Task Book

Image
Banner image of the Wildland Fire Learning Portal website

NWCG’s training course catalog is now available on the Wildland Fire Learning Portal (WFLP).

To access the training course catalog, visit WFLP and either set up an account or login as a guest.