Skip to main content

Hazard Tree – Secure Felling Area

Forest road with sign blocking road reading falling area positively no entrance.

The following fundamental safety principles for tree felling operations have been established based on repeated lessons learned following serious accidents. To protect sawyers, swampers, and operational personnel from exposure to potential traumatic injury or death during tree felling operations, the following safety procedures should be applied to all felling activities. Fireline supervisors should continue to monitor all felling operations to ensure the following safe job procedures are consistently applied:

  • A secure felling area, MINIMUM OF TWO AND ONE HALF (2.5) TIMES THE HEIGHT OF THE MATERIAL BEING FELLED IN ALL DIRECTIONS, needs to be established and maintained by the faller during all tree felling operations. In addition, the entire downhill side on slopes must be secured if materials can fall/role for a long, unpredictable distance.
  • No one shall be permitted in the secured felling area without the authorization of the faller.
  • The faller shall establish a safety zone outside the secured area and direct EVERYONE to remain there until all felling is completed and an "all clear" has been communicated.
  • Safety zones should be established, whenever practical, in the opposite direction of the planned fall, and at a distance of at least 2.5 times the height of the trees being felled.
  • The faller shall assign lookout(s). The lookout(s) shall have reliable communications with the faller, and other personnel adjacent to the secure areas.
  • Competent lookouts shall be established and maintained by the faller at all major access points of roads and trails that afford access to the secured felling area.
  • The faller will ensure that no hazards remain such as hang-ups, unstable logs, or other dangers before approving access or leaving the secured area.

 

Category

Last Modified / Reviewed:

Have an idea or feedback?

Share it with the NWCG 6MFS Subcommittee.


Follow NWCG on Twitter and Facebook

Share on Social Media

NWCG Latest Announcements

NWCG Equipment Technology Committee Releases Safety Warning: 25-001 Non-specification fire shelters

Date: January 15, 2025
Contact: Equipment Technology Committee

The Equipment Technology Committee (ETC) has released Safety Warning: 25-001 Non-specification fire shelters. Non-specification fire shelters claiming to meet Forest Service (FS) fire shelter specification 5100-606 were first found in February of 2023. As of September 2024, non-specification shelters are again being advertised and sold on the open market.

This Safety Warning outlines details and recommended procedures to purchase FS specification shelters made with materials and components that meet performance criteria and toxicity testing requirements outlined in FS Specification 5100-606. 

For additional information on identifying non-specification shelters, please view ETC Safety Warning 23-01.

References:

ETC Safety Warning 25-001: Non-specification fire shelters

NWCG Equipment Technology Committee

ETC Safety Warning 23-01

Paul Gleason Lead by Example Awards

Date: January 14, 2025
Contact: Leadership Committee

The NWCG Leadership Committee has awarded the 2023 Paul Gleason “Lead By Example” awards to individuals in the categories of Initiative and Innovation, Mentoring and Teamwork, and Motivation and Vision, as well as a Lifetime Achievement Award.

Congratulations to the awardees:

  • Sam Bowen, Superintendent of the Mark Twain Veteran Crew with the U.S. Forest Service.
  • Greg Titus, Zone Fire Management Officer for the St. Marks National Wildlife Refuge with U.S. Fish and Wildlife Service.
  • Renae Crippen, Manager of the Blue Mountain Interagency Dispatch Center with the U.S. Forest Service.
  • Eric Carlson, Instructor with OMNA International.

References:

Paul Gleason Lead by Example Award

Wildland Fire Leadership Development Program

Interview with Paul Gleason

Updated NWCG Standards for Water Scooping Operations, PMS 518

Date: December 19, 2024
Contact: Water Scooper Operations Unit

The NWCG Standards for Water Scooping Operations, PMS 518 establishes the standards for dispatching, utilizing, and coordinating water scooping aircraft on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, and any local, state, or geographic/regional water scooping plans.

References:

NWCG Standards for Water Scooping Operations, PMS 518

Updated NWCG Standards for Aerial Supervision, PMS 505

Date: December 19, 2024
Contact: Interagency Aerial Supervision Subcommittee

The Interagency Aerial Supervision Subcommittee has updated the NWCG Standards for Aerial Supervision, PMS 505. PMS 505 establishes standards for aerial supervision operations for national interagency wildland fire operations. 

References:

NWCG Standards for Aerial Supervision, PMS 505