Skip to main content

Status/Check-In Recorder

SCKN Incident Position Description

The Status/Check-in Recorder (SCKN) ensures that all resources assigned to an incident are checked in and accounted for. The SCKN is supervised by the Resource Unit Leader (RESL) and works in the Planning functional area.

Leadership Level 1, Follower (Provide Action)

  • For additional information review Level 1 description, expected behaviors and knowledge, suggested development goals, and self-study opportunities.

Prepare and Mobilize

  • Ensure individual readiness.
  • Gather critical information pertinent to the assignment.
  • Travel to and check in at assignment.
  • Check in with incident supervisor when arriving at the incident.
  • Obtain briefing from previous shift/assignment position as necessary.

Build The Team

  • Continually gather critical information relevant to the incident.
  • Assist other functional areas, as requested.
  • Provide a positive influence and promote teamwork.
  • Share expertise with other Status/Check-In Recorders (SCKNs) and incident personnel, as appropriate.

Perform Status/Check-in Recorder-Specific Duties

  • Set up check-in station(s).
  • Welcome and orient resources to the incident upon their arrival.
  • Check in resources.
  • Enter resource information into the resource tracking application.
  • Ensure information entered into the resource tracking application is current and accurate.

Communicate and Coordinate

  • Follow established processes and chain of command for collecting, producing, and distributing information.
  • Coordinate with other functional areas (such as the Operations, Planning, and Logistics sections).
  • Participate in After Action Reviews (AARs).

Manage Risk

  • Adhere to established guidelines for work/rest, personal protective equipment (PPE), and communication.
  • Monitor for signs and symptoms of fatigue, illness, or injury. Mitigate appropriately.

Document

  • Complete all administrative tasks and documentation in an accurate and timely manner.

Demobilize

  • Return equipment and supplies to appropriate unit.
  • Transition check-in responsibilities to incoming Status/Check-In Recorder (SCKN), Resources Unit Leader (RESL), or Planning Section Chief (PSC).
  • Complete demobilization checkout process before being released from the incident.
  • Upon demobilization, report status to home unit including reassignment or estimated time of arrival (ETA).

Return to top

USWDS Paragraph Bundles

Please Provide Feedback

Indicates required field

NWCG values your constructive input and we thank you for taking the time to provide feedback.

Although contact information is optional, we hope that you provide a way for us to contact you in case we need clarification on your comment. If you would like to be contacted regarding your feedback, you must provide contact information. 

Would you like a response?
If you would like a response, you must provide contact information (name and email) below.
One file only.
9.28 GB limit.
Allowed types: gif, jpg, jpeg, png, bmp, eps, tif, pict, psd, txt, rtf, html, odf, pdf, doc, docx, ppt, pptx, xls, xlsx, xml, avi, mov, mp3, mp4, ogg, wav, bz2, dmg, gz, jar, rar, sit, svg, tar, zip.
CAPTCHA
Image CAPTCHA
Enter the characters shown in the image.
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.
Last Modified / Reviewed:

NWCG Latest Announcements

ETC Equipment Bulletin: 25-003 Flame-Resistant Shirt Survey

Date: June 12, 2025
Questions?  Please contact:
Equipment Technology Committee

The U.S. Forest Service National Technology and Development Program (NTDP) is seeking input on the Forest Service-designed flame-resistant (FR) shirt, currently available through the National Interagency Support Cache system and FedMall.

NTDP is conducting a product review to improve future FR shirt designs. As part of this effort, a short survey is now open for federal employees who have worn any of three recent FR shirt models. Feedback will guide design improvements to better meet the needs of wildland firefighters.

To comply with the Paperwork Reduction Act, responses are limited to federal employees. The survey is open through September 12, 2025. 

References:

NWCG Alerts

ETC Equipment Bulletin: 25-003

NEW! S-130, Firefighter Training (Blended) Now Available

Date: June 10, 2025
If you have questions, please visit our FAQ page. 
If your question is not answered there, you can 
submit your question using our Contact Us form. 
 

The S-130, Firefighter Training (Blended), equips new wildland firefighters with essential skills through a mix of online learning and hands-on training. The course features a required online component and an instructor-led exercise, reinforcing online concepts with practical performance-based training.

The course builds competencies in wildland fire operations, safety, and equipment use, applicable across various operational environments. Both the online component and instructor-led field exercise must be completed to receive a certificate of completion. Students are required to finish the prerequisite S-190, Introduction to Wildland Fire Behavior, before enrolling in S-130, Firefighter Training (Blended).

References:

S-130, Firefighter Training (Blended)

S-190, Introduction to Wildland Fire Behavior

Wildland Fire Learning Portal

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

Date: June 3, 2025
Questions?  Please contact:
Emergency Medical Committee

The Emergency Medical Committee has issued interim guidance for Rapid Extraction Module Support (REMS) teams. Until further notice, Type I and II REMS teams must designate a team leader qualified at Firefighter Type 1 Squad Boss (FFT1) or higher. This temporary change replaces the Single Resource Boss (SRB) requirement, which is currently not feasible due to administrative barriers.

This memorandum does not include any other changes to the NWCG Standards for Rapid Extraction Module Support, PMS 552. This interim change takes effect immediately and will remain in place until further notice.

References:

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

NWCG Standards for Rapid Extraction Module Support, PMS 552

Equipment Bulletin 25-002: Chaps, Chain Saw, M-2020, Nonconformities Affecting Use, Appearance, and Serviceability

Date: June 2, 2025
Questions?  Please contact:
Equipment Technology Committee

The Equipment Technology Committee issued Equipment Bulletin: 25-002 to address a manufacturing nonconformity affecting Forest Service specification, 6170-4K Chain Saw Chaps. The issue applies to chaps manufactured in 2024 and 2025 and distributed through FedMall. These chaps may have incorrectly bound edges that expose inner protective layers.

Independent purchasers should inspect all chain saw chaps received from FedMall beginning in 2024, prior to use. Review the full Equipment Bulletin: 25-002 for inspection criteria and recommended actions.

References:

NWCG Alerts

ETC Equipment Bulletin: 25-002