Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Visually inspect for damage, cracks, broken, melted parts or evidence of leakage, if any dispose of. 
  2. Inspect lid for proper closure and working hinges. 
  3. Inspect handles. 
  4. Inspect drain plug for leakage or any damage.  
  5. Refurbish if damage is determined to be repairable. 
  6. Return to stock if item is clean, undamaged and/or in unused condition. 
  7. Dispose of item if damage is determined to be unrepairable or if stains cannot be cleaned. 
  8. Salvage any usable parts for future repairs.

Refurbishing Procedures

A. Cleaning

  1. Use pressure washer to clean inside and outside of ice chest. Disinfect per Cache direction. 
  2. If necessary clean stains with a scrubbing pad and mild detergent. 
  3. Rinse thoroughly. 
  4. Stand upside down to air dry and/or wipe down completely to dry.

B. Repair

  1. Lid – replace hinges if possible
  2. Handles –replace if possible
  3. Drain plug– replace if possible
  4. Spray paint top lid of ice chest if any unwanted writing is present
  5. If ice chest has water inside the lid drill a 1/8” hole in lid to take out excess water, use glue from a hot glue gun to fill the hole after completely drained and dry.

C. Testing for Performance

  • If drain plug was replaced, add water to inside of ice chest to ensure drain is not leaking.

D. Repackaging

  1. Stencil and spray paint or use permanent marker to apply NFES #000557 to the exterior of the chest.
  2. Band clean/dry ice chest with one band.
  3. Palletize per local cache option.

 

NWCG Latest Announcements

ETC Bulletin 25-001: Retrofitted Hot/Cold Beverage Kits - 2025 Field Season

Date: April 16, 2025
Questions?  Please contact:
Equipment Technology Committee

Due to spout failures and the associated risk of burn injuries, manufacturers have retrofitted the Hot/Cold Beverage Kits using a heat-shrinking band to secure the black spout at the insertion site. The updated kits feature a fluorescent label on each full kit assembly for easy identification. Catering units are encouraged to confirm the clear heat-shrinking bands are intact around each spout before filling.

ETC Bulletin 24-001 regarding Hot/Cold Beverage Kits has been archived and replaced by ETC Bulletin 25-001 for the 2025 season.

References:

NWCG Alerts

ETC-EB-25-001 Retrofitted Hot/Cold Beverage Kits

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412