Valve – Wye, Gated, 1 1/2” NH-F X 1 1/2” NH-M X 1 1/2” NH-M

NFES #
000231
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for the following:
    1. Handles-bent, broken, missing, too tight, too loose, expansion pins coming out or missing, handles correct (left and right) and positioned properly.
    2. Male flange-flange missing, lock-ring and set-screws functional, damaged threads, smooth flat surface on flange, burrs on threads, or loose male flange.
    3. Female coupling-Coupling spins freely, gasket present, and in good condition free of cracks or damage, burrs on threads.
    4. Casting (body)-Fire damage—look for further damage, O-rings in good condition, corrosion, cracks, and burrs.
    5. Plastic sphere-Inspect sphere while turning handle; if pitted or rough, replace.
  2. Return to stock if item is clean, passes inspection, and is in unused condition.
  3. Refurbish if deficiencies are discovered during the inspection process and item requires cleaning.
  4. Dispose of item if damages are not repairable or item has sustained damage caused by fire.

Refurbishing Procedures

A. Cleaning

  1. Clean in a mild detergent with brush and scouring pad or use parts washer or high-pressure wash to remove foreign matter such as mud, dirt, or grease. Rinse thoroughly.
  2. Do not soak for extended periods of time as detergent will corrode the metal.
  3. Stand upright with barrels in open position to drain water and dry.
  4. Lubricate with appropriate type of lubricant.

B. Repair

  1. Replace missing or damaged O-rings and gaskets.
  2. Replace broken, missing handles.
  3. Repair or replace male flange if damaged is discovered on face or threads.
  4. Replace female coupling or bearings if not spinning freely.

C. Testing for Performance

  1. Install valve on test pump.
  2. Turn on water to pump and open valve to expel air then close valve.
  3. Turn on pump
  4. NFES #000259 and NFES #000231 test at 300 PSI for 3 minutes.
  5. Inspect for leaks around the gasket, at the handles, and around flanges while on test pump.
  6. If valve leaks, repair as necessary, or dispose of through local procedures.
  7. Retest after repairs are made.

D. Repackaging

  1. Ensure item is completely dry prior to packaging.
  2. Packaging:
    • Use NFES #000823 carton (15” x 15” x 10”) for a standard pack of 10 EA.

 

NWCG Latest Announcements

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508

WFSTAR 2025 Core Component Module Package and 2024 Fire Year in Review Now Available

Date: March 14, 2025
Questions?  Please contact:
Joe Schindel at mschindel@blm.gov
 

The 2025 Core Component Module Package for RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) and the 2024 Fire Year in Review are now available on the NWCG website. The 2025 Core Component Module Package provides all content needed to deliver RT-130.

References:

2025 Core Component Module Package

2024 Fire Year in Review Module

NEW! NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053

Date: March 12, 2025
Contact: Wildland Urban Interface Mitigation Committee

The NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 provides mitigation practitioners at all experience levels with recommendations on the most effective and efficient ways to accomplish mitigation work in communities at risk to wildfire damage or destruction. The content in this guide was written in coordination with the NWCG Standards for Mitigation in the Wildland Urban Interface, PMS 052.

References:

NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430