PMS 530-1

Aircraft

Aerial Supervision Risk Assessments

Aircraft | Operations | Maintenance | Personnel


SYSTEM:  Aerial Supervision, Aircraft

Sub-System Hazards Pre-Mitigation Mitigation Post-Mitigation

Probability

Severity

Risk Level

Probability

Severity

Risk Level

Avionics Avionics failure: Primary communication radio, avionics master or Traffic Alert and Collision Avoidance System (TCAS) fail

Possible

Moderate

Medium

A) Minimum equipment list (MEL) establishes minimum requirement.

B) Mission requirements as determined by the flight crew.

C) Integrate into preflight checklist.

Unlikely

Negligible

Low

ASM/ATGS avionics package insufficient for mission complexity

Likely

Critical

Extremely High

A) Contract specifications that recognize mission requirements.

B) Ensure necessary type, configuration, and number of radios to complete mission safely.

C) Reduce span of control.

D) Limit operations.

Unlikely

Moderate

Medium

ATGS or ATGS contract pilot unfamiliar with avionics (can't run radios or GPS, etc.)

Possible

Moderate

Medium

A) Release and replace the pilot, enforce contract specifications.

B) Release and replace the ATGS.

C) Continue currency training for the ATGS to include: FM radio programming and GPS operations.

Unlikely

Negligible

Low

Aircraft Type Reduced field of view for pilot and/or flight crew

Almost Certain

Critical

Extremely High

A) Ensure aircraft is appropriate for the mission.

B) Flight profile altered to maximize visibility.

C) Use of TCAS.

D) Clear communication with other aircraft.

E) Alter interior configuration (headrest, seat, windows).

Possible

Moderate

Medium

Performance Standards Poor Engine performance (single/twin, turbine/recip) for the ATGS mission

Possible

Catastrophic

Extremely High

A) Plan for high density altitudes.

B) Download cargo/fuel load.

C) Relocate to favorable location.

D) Alter the mission.

E) Upgrade the aircraft.

F) Ensure aircraft is appropriate for the mission.

G) Perform preflight planning.

Unlikely

Catastrophic

High

Contracting Contract ATGS, pilot skill/fire experience leading to sub-standard performance (i.e., working avionics, flight skills) during flight operations

Unlikely

Critical

Medium

A) Conduct thorough briefings.

B) Ride along with veteran fire pilot.

C) Document performance via contract evaluation process.

D) CWN/ARA Contractors need to receive better training, possibly in the form of computer-based training.

E) Require Air Attack pilots to take a check ride every three years.

Rare

Critical

Medium

Fuel Capacity and Procedure, ground fueling errors

Almost Certain

Catastrophic

Extremely High

A) Verify adequate volume of fuel for mission.

B) Pilot needs to be present during fueling to ensure proper procedures, correct fuel type and verify quantity.

Unlikely

Catastrophic

High

 

Download the Word version (docx) of this information and the Risk Assessment Matrix (pdf) to use with the Risk Assessment Worksheet (docx).

 

Modified / Reviewed:

NWCG Latest Announcements

WFSTAR 2025 Core Component Module Package and 2024 Fire Year in Review Now Available

Date: March 14, 2025
Questions?  Please contact:
Joe Schindel at mschindel@blm.gov
 

The 2025 Core Component Module Package for RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) and the 2024 Fire Year in Review are now available on the NWCG website. The 2025 Core Component Module Package provides all content needed to deliver RT-130.

References:

2025 Core Component Module Package

2024 Fire Year in Review Module

NEW! NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053

Date: March 12, 2025
Contact: Wildland Urban Interface Mitigation Committee

The NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 provides mitigation practitioners at all experience levels with recommendations on the most effective and efficient ways to accomplish mitigation work in communities at risk to wildfire damage or destruction. The content in this guide was written in coordination with the NWCG Standards for Mitigation in the Wildland Urban Interface, PMS 052.

References:

NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430

NEW! NWCG Standards for Airtanker Operations, PMS 514

Date: March 7, 2025
Contact: National Interagency Aviation Committee

The NWCG Standards for Airtanker Operations, PMS 514 establishes the standards for dispatching, utilizing, and coordinating airtankers on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, NWCG Standards for Airtanker Base Operations (SABO), PMS 508, and any applicable agency plans.

References:

NWCG Standards for Airtanker Operations, PMS 514