Skip to main content

PMS 530-1

Fixed Wing Risk Assessments

Fixed-Wing Operations vary greatly in complexity and risk exposure. With any flight there is an inherent risk.  That risk is the product of hazards associated with conducting operations in a specific flight environment and the potential for those identified hazards to affect the outcome of the mission/flight.  Risk Assessments (RA) help to identify potential hazards, the effect they could have on mission outcome, and mitigations that might help to lessen those outcomes. A RA should be a part of pre-mission planning.

The links provided will direct you to RAs categorized by System and Sub-System. For your specific mission you may need information provided on multiple pages.  Please take the time to review all System and Sub-System pages that relate to your specific mission/aircraft. The RAs provided have been submitted and/or reviewed by the interagency committees and subcommittees with mission expertise related to the specific RAs.  The Aviation Risk Management Subcommittee (ARMS) has approved these RAs for inclusion in the NWCG Aviation Risk Management Workbook, PMS 530-1.  You will find the Page Last Modified / Reviewed date at the bottom of each RA to help identify the most recent version/content. If you identify additional hazards and mitigations which need to be added or if you recognize revisions that need to be made to existing RAs, please Submit Revision/Recommendation.  You will find additional directions on how to submit information on that page.  If you need direction regarding how to use this workbook, please reference How to Use Workbook where you will find specific guidance on how best to utilize this information.

Available Options

Note:  Some risk assessments are not yet available.

Aerial Survey / Census

Forest Health Protection (FHP)

Large Airtanker (LAT)

Lead Plane / Aerial Supervision Module

Scoopers

 

Single Engine Airtanker (SEAT)

Last Modified / Reviewed:

NWCG Latest Announcements

ETC Equipment Bulletin: 25-003 Flame-Resistant Shirt Survey

Date: June 12, 2025
Questions?  Please contact:
Equipment Technology Committee

The U.S. Forest Service National Technology and Development Program (NTDP) is seeking input on the Forest Service-designed flame-resistant (FR) shirt, currently available through the National Interagency Support Cache system and FedMall.

NTDP is conducting a product review to improve future FR shirt designs. As part of this effort, a short survey is now open for federal employees who have worn any of three recent FR shirt models. Feedback will guide design improvements to better meet the needs of wildland firefighters.

To comply with the Paperwork Reduction Act, responses are limited to federal employees. The survey is open through September 12, 2025. 

References:

NWCG Alerts

ETC Equipment Bulletin: 25-003

NEW! S-130, Firefighter Training (Blended) Now Available

Date: June 10, 2025
If you have questions, please visit our FAQ page. 
If your question is not answered there, you can 
submit your question using our Contact Us form. 
 

The S-130, Firefighter Training (Blended), equips new wildland firefighters with essential skills through a mix of online learning and hands-on training. The course features a required online component and an instructor-led exercise, reinforcing online concepts with practical performance-based training.

The course builds competencies in wildland fire operations, safety, and equipment use, applicable across various operational environments. Both the online component and instructor-led field exercise must be completed to receive a certificate of completion. Students are required to finish the prerequisite S-190, Introduction to Wildland Fire Behavior, before enrolling in S-130, Firefighter Training (Blended).

References:

S-130, Firefighter Training (Blended)

S-190, Introduction to Wildland Fire Behavior

Wildland Fire Learning Portal

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

Date: June 3, 2025
Questions?  Please contact:
Emergency Medical Committee

The Emergency Medical Committee has issued interim guidance for Rapid Extraction Module Support (REMS) teams. Until further notice, Type I and II REMS teams must designate a team leader qualified at Firefighter Type 1 Squad Boss (FFT1) or higher. This temporary change replaces the Single Resource Boss (SRB) requirement, which is currently not feasible due to administrative barriers.

This memorandum does not include any other changes to the NWCG Standards for Rapid Extraction Module Support, PMS 552. This interim change takes effect immediately and will remain in place until further notice.

References:

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

NWCG Standards for Rapid Extraction Module Support, PMS 552

Equipment Bulletin 25-002: Chaps, Chain Saw, M-2020, Nonconformities Affecting Use, Appearance, and Serviceability

Date: June 2, 2025
Questions?  Please contact:
Equipment Technology Committee

The Equipment Technology Committee issued Equipment Bulletin: 25-002 to address a manufacturing nonconformity affecting Forest Service specification, 6170-4K Chain Saw Chaps. The issue applies to chaps manufactured in 2024 and 2025 and distributed through FedMall. These chaps may have incorrectly bound edges that expose inner protective layers.

Independent purchasers should inspect all chain saw chaps received from FedMall beginning in 2024, prior to use. Review the full Equipment Bulletin: 25-002 for inspection criteria and recommended actions.

References:

NWCG Alerts

ETC Equipment Bulletin: 25-002