Skip to main content

PMS 530-1

Aircraft

Large Airtanker (LAT) Risk Assessments

Aircraft | Contracts | Operations | Personnel


SYSTEM:  Large Airtanker, Aircraft

Sub-System Hazards Pre-Mitigation Mitigation Post-Mitigation

Probability

Severity

Risk Level

Probability

Severity

Risk Level

Airworthiness Previous aircraft use/maintenance programs did not compensate for structural loads experienced during the fire mission

Possible

Catastrophic

Extremely High

Continue utilizing USFS Continued Airworthiness Program, in association with contractual requirements and industry standards required by FAR 25.571. Incorporate the latest inspection technology.

Unlikely

Critical

Medium

Load limit exceedance

Possible

Critical

High

Maintain a load monitoring system, utilizing the latest inspection technology. Maintain routine (daily) inspection program.

Rare

Critical

Medium

Engine failures

Likely

Critical

Extremely High

Follow prescribed schedule for engine maintenance and overhaul. Reduce overhaul intervals.

Unlikely

Moderate

Medium

Airframe Significant exposure to airframe stresses in the firefighting mission profile poses additional fatigue factors that shorten airframe life expectancy

Almost Certain

Catastrophic

Extremely High

Perform Damage Tolerance and Fatigue (DT&F) analysis in accordance with 14 CFR 25.571 for the tanker mission and require inspection programs and life limits based on that analysis.

Unlikely

Moderate

Medium

 

Download the Word version (docx) of this information and the Risk Assessment Matrix (pdf) to use with the Risk Assessment Worksheet (docx).

 

 

Modified / Reviewed:

NWCG Latest Announcements

WFSTAR 2025 Core Component Module Package and 2024 Fire Year in Review Now Available

Date: March 14, 2025
Questions?  Please contact:
Joe Schindel at mschindel@blm.gov
 

The 2025 Core Component Module Package for RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) and the 2024 Fire Year in Review are now available on the NWCG website. The 2025 Core Component Module Package provides all content needed to deliver RT-130.

References:

2025 Core Component Module Package

2024 Fire Year in Review Module

NEW! NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053

Date: March 12, 2025
Contact: Wildland Urban Interface Mitigation Committee

The NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 provides mitigation practitioners at all experience levels with recommendations on the most effective and efficient ways to accomplish mitigation work in communities at risk to wildfire damage or destruction. The content in this guide was written in coordination with the NWCG Standards for Mitigation in the Wildland Urban Interface, PMS 052.

References:

NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430

NEW! NWCG Standards for Airtanker Operations, PMS 514

Date: March 7, 2025
Contact: National Interagency Aviation Committee

The NWCG Standards for Airtanker Operations, PMS 514 establishes the standards for dispatching, utilizing, and coordinating airtankers on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, NWCG Standards for Airtanker Base Operations (SABO), PMS 508, and any applicable agency plans.

References:

NWCG Standards for Airtanker Operations, PMS 514