Skip to main content

Briefing Map

Product Description

The Briefing Map is displayed in the briefing area and used during operational briefings. It is a simplified, large-format map of the incident area that is used to discuss work assignments and other operational details. The briefing map can be printed or displayed digitally using a projector. Sometimes this map is referred to as a Briefing Area Map (BAM).

Target Audience

Incident personnel attending the operational briefing.

Guidelines

  • Standard Incident Command System (ICS) symbology. Symbols should be enlarged as necessary for visibility.
  • Simple fonts and symbols for non-ICS features such as roads at exaggerated sizes, large enough to be read from the back of the briefing area.
  • Simplified base map to enable clear communication.
  • Extent and map content is based on operations occurring on the fire, the Situation Unit Leader (SITL) will provide guidance.
  • Printed or projected as large as possible to serve a large crowd and to be visible from a distance.

Standard Elements

All map products produced should include the STANDL-SGD cartographic elements.

Data

  • Wildfire Daily Fire Perimeter (Polygon) with Contained and Uncontained Perimeter Lines.
  • Event Points (including, but not limited to: Camps, Drop Points, Helispots, Helibase, and Incident Command Post).
  • Event Lines (including, but not limited to: Planned and Completed Lines).
  • Assignment (Division, Branch, Zone) breaks and labels.
  • Major transportation routes to and from the incident.
  • Other Situation Unit Leader (SITL)-requested data (including, but not limited to: Administrative Boundaries, Land Ownership / Jurisdiction, Special Management Areas, Utilities).

Examples

These are examples from actual incidents and may include non-standard elements.

Also note that examples use the standard symbols at the time of their creation and may not reflect the current GeoOps symbology. Map elements, incident features, and composition remain consistent across these visual changes.

  1. 2021 Caldor Fire
  2. 2022 Hermits Peak Fire
  3. 2022 Fish Fire
  4. 2010 Wrangler Fire
  5. 2016 Beaver Creek Fire
  6. 2017 Boundary Fire

 

Last Modified / Reviewed:

NWCG Latest Announcements

Incident Position Standards and Next Generation Position Task Book Available for Helicopter Crewmember

Date: April 28, 2025
Questions?  Please contact:
Interagency Helicopter Operations Subcommittee

NWCG is excited to announce that the NWCG Incident Position Standards for Helicopter Crewmember, PMS 350-22, and the NWCG Position Task Book for Helicopter Crewmember (HECM), PMS 311-22, are now available.

These resources, part of the Performance Support Package developed through the Incident Performance and Training Modernization (IPTM) effort, support trainees, qualified personnel, and evaluators.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Incident Position Standards for Helicopter Crewmember, PMS 350-22

NWCG Incident Position Standards for Helicopter Crewmember, PMS 350-22

NWCG Position Task Book for Helicopter Crewmember (HECM), PMS 311-22

Updated NWCG Standards for Fire Unmanned Aircraft Systems Operations, PMS 515

Date: April 23, 2025
Questions?  Please contact:
Interagency Fire Unmanned Aircraft Systems Subcommittee

The NWCG Standards for Fire Unmanned Aircraft Systems Operations, PMS 515 standardizes processes and procedures for the interagency use of Unmanned Aircraft Systems (UAS), including pilot inspections and approvals. This updated publication provides the aviation community with standards to ensure UAS are used safely, effectively, and efficiently in support of fire management goals and objectives.

References:

NWCG Standards for Fire Unmanned Aircraft Systems Operations, PMS 515

NWCG National Interagency Aviation Committee

ETC Bulletin 25-001: Retrofitted Hot/Cold Beverage Kits - 2025 Field Season

Date: April 16, 2025
Questions?  Please contact:
Equipment Technology Committee

Due to spout failures and the associated risk of burn injuries, manufacturers have retrofitted the Hot/Cold Beverage Kits using a heat-shrinking band to secure the black spout at the insertion site. The updated kits feature a fluorescent label on each full kit assembly for easy identification. Catering units are encouraged to confirm the clear heat-shrinking bands are intact around each spout before filling.

ETC Bulletin 24-001 regarding Hot/Cold Beverage Kits has been archived and replaced by ETC Bulletin 25-001 for the 2025 season.

References:

NWCG Alerts

ETC-EB-25-001 Retrofitted Hot/Cold Beverage Kits

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)