Skip to main content

Map Product Standards

Note: The Situation Map has been deprecated as a map standard. The Operations map should be used as an acceptable substitute for task book purposes.


Purpose

Standards for typical maps produced by the Situation Unit used during wildland fire incidents are key to readability and uniformity.

GIS is rapidly changing how maps are delivered on incidents. Digital map products–geospatial pdf maps, websites, or files–have become a large part of the Geographic Information System Specialist (GISS)​ workload. Requests for digital maps or data for smartphone applications, public information maps created for websites, maps to be projected during briefings, or files containing the underlying spatial data, have changed the way the GISS delivers incident products. There is a slow but continuous move away from hard copy paper products and to a digital product that can be updated rapidly for the field user.

The GISS will need to be flexible in applying these standards, as the Situation Unit Leader (SITL) and other end-users may have specific needs or preferences. The most important criteria in the preparation of map products are the operational business drivers (i.e., primary use) for the products. The primary use should drive the focus of the maps. Whether provided hard copy on paper or digitally via mobile device, the map product standards still apply.

Specifications

  • Maps produced on an incident should communicate the intended message clearly.
  • Use of standardized colors for maps printed in color; e.g., blue for water, green for vegetation.
  • Include S.T.A.N.D.L S.G.D on every map.
  • All incident map requests are channeled through the SITL or Planning Section Chief (PSC) so they are kept informed of the GISS workload and can help prioritize needs.
  • The SITL (or equivalent) decides which maps to produce and approves final versions.
  • The SITL directs the use of logos.
  • Placement of fire acreage (and total acreage reported) on maps is at the discretion of the SITL.
  • North arrow may need to be rotated to indicate true north correctly.
  • Maps may be requested that are not listed in this section. Those map products should adhere to standards detailed in other sections of GeoOps.
  • Data: “Topographic Base” includes Contours and/or Shaded Relief (Hillshade), Hydrographic features (Lakes, Rivers, Streams), Transportation features (Roads, Trails, Railroads), Place Names (GNIS), Administrative and Jurisdictional Boundaries, Political Boundaries (City, County, State, National), Public Land Survey System Boundaries (Township, Range, Section). The Forest Service Basemap (FSBasemap) may be used as a Topographic Base.
  • Drafts: Maps that are for review only should include “DRAFT.”
  • Sensitive information: Maps should have a label defining the sensitivity of the data (e.g., “For Official Use Only,” “Not for Public Distribution or Use”).
  • Disclaimers: Maps may include disclaimers if requested or required under delegated authority (e.g., “For Reference Only”).
  • Proprietary information: Maps should cite the source for any proprietary information.

References

Responsibilities

Timelines for map production are established with the SITL, PSC, or the assigned supervisor. The GISS generates all products on time for scheduled briefings and other meetings. Map definitions should be used as general guidelines; the SITL or PSC has the authority to deviate from the standards and produce additional maps not covered by the standards.

 

Last Modified / Reviewed:

NWCG Latest Announcements

2025 Week of Remembrance

Date: June 27, 2025
Questions?  Please contact:
6 Minutes for Safety Subcommittee

As we approach the 2025 Week of Remembrance (WOR), June 30–July 6, we dedicate this time to reflect on the past incidents from 2015 and honor the fallen through learning. Since its inception in 2014, WOR has honored wildland firefighters who made the ultimate sacrifice while encouraging critical discussions that reinforce lessons learned.

Throughout the week, we encourage thoughtful and generative conversations—whether in briefing rooms or at tailgates—that promote a culture of continuous learning and safety.

References:

2025 Week of Remembrance: Letter to Leadership

Wildland Fire Lessons Learned Center

ETC Equipment Bulletin: 25-003 Flame-Resistant Shirt Survey

Date: June 12, 2025
Questions?  Please contact:
Equipment Technology Committee

The U.S. Forest Service National Technology and Development Program (NTDP) is seeking input on the Forest Service-designed flame-resistant (FR) shirt, currently available through the National Interagency Support Cache system and FedMall.

NTDP is conducting a product review to improve future FR shirt designs. As part of this effort, a short survey is now open for federal employees who have worn any of three recent FR shirt models. Feedback will guide design improvements to better meet the needs of wildland firefighters.

To comply with the Paperwork Reduction Act, responses are limited to federal employees. The survey is open through September 12, 2025. 

References:

NWCG Alerts

ETC Equipment Bulletin: 25-003

NEW! S-130, Firefighter Training (Blended) Now Available

Date: June 10, 2025
If you have questions, please visit our FAQ page. 
If your question is not answered there, you can 
submit your question using our Contact Us form. 
 

The S-130, Firefighter Training (Blended), equips new wildland firefighters with essential skills through a mix of online learning and hands-on training. The course features a required online component and an instructor-led exercise, reinforcing online concepts with practical performance-based training.

The course builds competencies in wildland fire operations, safety, and equipment use, applicable across various operational environments. Both the online component and instructor-led field exercise must be completed to receive a certificate of completion. Students are required to finish the prerequisite S-190, Introduction to Wildland Fire Behavior, before enrolling in S-130, Firefighter Training (Blended).

References:

S-130, Firefighter Training (Blended)

S-190, Introduction to Wildland Fire Behavior

Wildland Fire Learning Portal

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

Date: June 3, 2025
Questions?  Please contact:
Emergency Medical Committee

The Emergency Medical Committee has issued interim guidance for Rapid Extraction Module Support (REMS) teams. Until further notice, Type I and II REMS teams must designate a team leader qualified at Firefighter Type 1 Squad Boss (FFT1) or higher. This temporary change replaces the Single Resource Boss (SRB) requirement, which is currently not feasible due to administrative barriers.

This memorandum does not include any other changes to the NWCG Standards for Rapid Extraction Module Support, PMS 552. This interim change takes effect immediately and will remain in place until further notice.

References:

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

NWCG Standards for Rapid Extraction Module Support, PMS 552