SYSTEM:  Helicopter Operations, Facilities (permanent and temporary)

Sub-System Hazards Pre-Mitigation Mitigation Post-Mitigation

Probability

Severity

Risk Level

Probability

Severity

Risk Level

Communication Lack of adequate base station VHF and FM radios-Not able to adequately communicate to helicopters out working missions/projects with handheld radios

Possible

Critical

High

Provide all Ex Use crews with mounted FM and AM radios on chase trucks (NOT just handhelds). Utilize Ex Use crews more often on incidents because they have the support equipment. Helibase Commo trailers should be on a National Contract instead of Geographic Area in order to lower cost.

Unlikely

Critical

Medium

Lack of adequate computers-not able to access necessary flight planning, ABS, and weather documents prior to missions

Almost Certain

Critical

Extremely High

Have Cache computers available for Incident/Unit personnel to check out that are Intranet accessible.  These computers should be able to access Internet as well for weather updates, TFR information, filing of flight plans, completing electronic payment forms, etc. Ensure all Ex Use bases have Internet as well as Intranet access in order to access critical WX, TFR and Flight Planning information.

Unlikely

Critical

Medium

Environment Haz Mat concerns/spills-Lack of adequate spill prevention/mitigation equipment on site and the knowledge to utilize it

Almost Certain

Moderate

High

Provide permanent as well as temporary helibases with approved Haz Mat storage facilities/equipment.  Solicit for National Contracts to provide portable hazmat storage facilities for Incidents.

Unlikely

Moderate

Medium

Inspection / Evaluation Lack of Accountability/Follow Up on Annual/Triennial Helibase Reviews

Likely

Moderate

High

Hold Management accountable to conduct follow up and remedy critical issues found in reviews and adhere to interagency and OSHA standards.

Unlikely

Negligible

Low

Utilization Span of Control/Collateral Duties. Personnel are often tasked with multiple duties especially during the emergence of an incident. Focused on Task at hand and not able to provide adequate oversight

Likely

Catastrophic

Extremely High

Ensure existing staffing, supervision and management policies and procedures are met. Place aviation resource needs at higher priority level in the resource ordering process. Need to ensure situation is recognized and ensure additional resources/supervision is ordered. Limit collateral duties in key supervisory positions. If unable to fill key positions operations will be shut down or limit use of aircraft until span of control issues are resolved.

Unlikely

Catastrophic

High

Policy Operational and mission goals during all-hazard assignments may be unstated or unclear and may conflict with interagency standards and policy

Likely

Critical

Extremely High

Adequate in-brief and dissemination of Commander's intent. Clarification of scope of authority and policy in place.  Adhere to interagency policy, procedures and guidelines (e.g., NSHO). If unable to perform duties utilizing interagency policy, perform a separate risk assessment with appropriate approval sign off. Ensure personnel are working within the scope of their employment. Implementation of Aviation Doctrine may further mitigate conflicts between direction and policy.

Possible

Critical

High

Training Unable to bring seasonals on early enough to provide all the required training prior to sending on incidents

Almost Certain

Critical

Extremely High

Ensure line officers are committed to providing adequate time and funding to develop personnel as necessary.

Possible

Critical

High

Lack of CRM

Likely

Critical

Extremely High

Provide adequate time for training and provide time for Modules to develop CRM prior to field season.  Provide training in CRM for Modules annually. Brief/debrief, maintain positive attitude.

Possible

Critical

High

Human Factors Fatigue/burnout due to incident duration as well as year-round All Risk incident support

Likely

Critical

Extremely High

Adhere to work/rest guidelines.  Monitor fatigue levels of crews.  Rotate personnel and helicopter programs to manage fatigue and burnout.  Manage number and duration of assignments. Ensure adequate time off and provide quality R and R while on assignments.

Possible

Critical

High

Acceptance of high-risk missions as normal

Likely

Catastrophic

Extremely High

Review risk assessment and existing policy/procedures, brief/debrief with all personnel and utilize risk management tools to include Go-No-Go Checklists. Educate personnel on the hazards of normalization of risk and complacency. Mission decision made at appropriate level. Must have better communication and collaboration between Operations and Aviation.

Possible

Critical

High

High workload for Maintenance Inspectors may compromise their ability to perform thorough inspections. Standard inspections criteria not followed consistently among agencies or regions

Likely

Critical

Extremely High

Increase amount of personnel available to perform the duties of Maintenance Inspector in proportion with span of control. Ensure inspection standards are developed and maintained by agencies.

Unlikely

Critical

Medium

Conflicting personalities resulting in hazardous attitudes

Possible

Critical

Extremely High

If individuals cannot professionally resolve differences, managers and supervisors must intervene immediately. Brief/debrief, employ CRM, provide honest and objective feedback, maintain positive attitude. Maintain professionalism and mission focus at all times.

Unlikely

Critical

Medium

 

Download the Word version (docx) of this information and the Risk Assessment Matrix (pdf) to use with the Risk Assessment Worksheet (docx).

 

 

Last Modified / Reviewed:

NWCG Latest Announcements

ETC Equipment Bulletin: 25-003 Flame-Resistant Shirt Survey

Date: June 12, 2025
Questions?  Please contact:
Equipment Technology Committee

The U.S. Forest Service National Technology and Development Program (NTDP) is seeking input on the Forest Service-designed flame-resistant (FR) shirt, currently available through the National Interagency Support Cache system and FedMall.

NTDP is conducting a product review to improve future FR shirt designs. As part of this effort, a short survey is now open for federal employees who have worn any of three recent FR shirt models. Feedback will guide design improvements to better meet the needs of wildland firefighters.

To comply with the Paperwork Reduction Act, responses are limited to federal employees. The survey is open through September 12, 2025. 

References:

NWCG Alerts

ETC Equipment Bulletin: 25-003

NEW! S-130, Firefighter Training (Blended) Now Available

Date: June 10, 2025
If you have questions, please visit our FAQ page. 
If your question is not answered there, you can 
submit your question using our Contact Us form. 
 

The S-130, Firefighter Training (Blended), equips new wildland firefighters with essential skills through a mix of online learning and hands-on training. The course features a required online component and an instructor-led exercise, reinforcing online concepts with practical performance-based training.

The course builds competencies in wildland fire operations, safety, and equipment use, applicable across various operational environments. Both the online component and instructor-led field exercise must be completed to receive a certificate of completion. Students are required to finish the prerequisite S-190, Introduction to Wildland Fire Behavior, before enrolling in S-130, Firefighter Training (Blended).

References:

S-130, Firefighter Training (Blended)

S-190, Introduction to Wildland Fire Behavior

Wildland Fire Learning Portal

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

Date: June 3, 2025
Questions?  Please contact:
Emergency Medical Committee

The Emergency Medical Committee has issued interim guidance for Rapid Extraction Module Support (REMS) teams. Until further notice, Type I and II REMS teams must designate a team leader qualified at Firefighter Type 1 Squad Boss (FFT1) or higher. This temporary change replaces the Single Resource Boss (SRB) requirement, which is currently not feasible due to administrative barriers.

This memorandum does not include any other changes to the NWCG Standards for Rapid Extraction Module Support, PMS 552. This interim change takes effect immediately and will remain in place until further notice.

References:

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

NWCG Standards for Rapid Extraction Module Support, PMS 552

Equipment Bulletin 25-002: Chaps, Chain Saw, M-2020, Nonconformities Affecting Use, Appearance, and Serviceability

Date: June 2, 2025
Questions?  Please contact:
Equipment Technology Committee

The Equipment Technology Committee issued Equipment Bulletin: 25-002 to address a manufacturing nonconformity affecting Forest Service specification, 6170-4K Chain Saw Chaps. The issue applies to chaps manufactured in 2024 and 2025 and distributed through FedMall. These chaps may have incorrectly bound edges that expose inner protective layers.

Independent purchasers should inspect all chain saw chaps received from FedMall beginning in 2024, prior to use. Review the full Equipment Bulletin: 25-002 for inspection criteria and recommended actions.

References:

NWCG Alerts

ETC Equipment Bulletin: 25-002