Skip to main content

Mapping: GPS Use for GIS Application

Set up before going to the field

  • Make sure fresh batteries are loaded and extra sets available.
  • Transfer background maps for the area using MapSource (if available).
  • Turn unit on to initialize and acquire satellites ahead of time if you are in a new area or haven’t used the unit in at least a week. This may take as long as 20 minutes in the open, away from buildings, canopy, and obstructions.
  • Download and clear old waypoints and tracks from memory.
  • Turn off Active Track log. Set it to the preferred Collection method (Time is best) and an appropriate logging rate for the data collection. Five seconds works for most walking collection. Keep in mind the total storage of the GPS.
  • Ensure Simulator Mode is not ON when collecting data.
  • Set unit time zone and date (Ensure Daylight Savings Time if needed).
  • Check Interface Protocol is set properly.
  • Set the Coordinate System (UTM or LAT/LONG) & Datum to ensure compatibility with written coordinates you may need to navigate to or Map.
  • Set Heading to magnetic or true. If true, ensure same declination is used.

Return to Top

Field – GPS Data Collection

  • Hold GPS antenna away from body with antenna up. Better yet, hold at, or above the head. Purchase an external antenna to free hands if needed or for better reception in vehicles.
  • Mark the waypoints for point locations at beginning and ending of track log collections. Writing down a position is just backup.
  • Most GPS units will collect data no matter what the GPS quality is. It’s up to you to monitor the GPS Satellite Page for anomalies and accuracy.
  • Collect when 3D GPS is shown. Do not collect data in 2D unless necessary.

Return to Top

Waypoints

  • Collect all waypoints in Averaged Position mode if you are standing still, when possible, and if your receiver has that capability. Minimum of 10 positions, maximum of 20 minutes. Somewhere in between is enough to generate a quality position in most cases.
  • Collect an instantaneous waypoint only when moving or in a hurry, or if using the eTrex line.
  • Edit default waypoint numbers to letters or words that are more descriptive, or make good field notes to ensure you remember what features are represented by which numbers.

Return to Top

Track logs

  • Use Stop when Full or Fill Record Mode rather than wrap to prevent overwriting track log points when Active Track log becomes full.
  • Turn on Active Track log at start location and immediately begin moving.
  • Stop Active Track log when movement is stopped or mission is finished.
  • Always Stop Active Track just shy of starting point when collecting an area (polygon). Overlapping makes conversion to GIS more challenging.
  • Use caution when saving an Active Track log. Garmin will generalize active track to save space, thereby degrading data.

Return to Top

NWCG Latest Announcements

ETC Equipment Bulletin: 25-003 Flame-Resistant Shirt Survey

Date: June 12, 2025
Questions?  Please contact:
Equipment Technology Committee

The U.S. Forest Service National Technology and Development Program (NTDP) is seeking input on the Forest Service-designed flame-resistant (FR) shirt, currently available through the National Interagency Support Cache system and FedMall.

NTDP is conducting a product review to improve future FR shirt designs. As part of this effort, a short survey is now open for federal employees who have worn any of three recent FR shirt models. Feedback will guide design improvements to better meet the needs of wildland firefighters.

To comply with the Paperwork Reduction Act, responses are limited to federal employees. The survey is open through September 12, 2025. 

References:

NWCG Alerts

ETC Equipment Bulletin: 25-003

NEW! S-130, Firefighter Training (Blended) Now Available

Date: June 10, 2025
If you have questions, please visit our FAQ page. 
If your question is not answered there, you can 
submit your question using our Contact Us form. 
 

The S-130, Firefighter Training (Blended), equips new wildland firefighters with essential skills through a mix of online learning and hands-on training. The course features a required online component and an instructor-led exercise, reinforcing online concepts with practical performance-based training.

The course builds competencies in wildland fire operations, safety, and equipment use, applicable across various operational environments. Both the online component and instructor-led field exercise must be completed to receive a certificate of completion. Students are required to finish the prerequisite S-190, Introduction to Wildland Fire Behavior, before enrolling in S-130, Firefighter Training (Blended).

References:

S-130, Firefighter Training (Blended)

S-190, Introduction to Wildland Fire Behavior

Wildland Fire Learning Portal

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

Date: June 3, 2025
Questions?  Please contact:
Emergency Medical Committee

The Emergency Medical Committee has issued interim guidance for Rapid Extraction Module Support (REMS) teams. Until further notice, Type I and II REMS teams must designate a team leader qualified at Firefighter Type 1 Squad Boss (FFT1) or higher. This temporary change replaces the Single Resource Boss (SRB) requirement, which is currently not feasible due to administrative barriers.

This memorandum does not include any other changes to the NWCG Standards for Rapid Extraction Module Support, PMS 552. This interim change takes effect immediately and will remain in place until further notice.

References:

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

NWCG Standards for Rapid Extraction Module Support, PMS 552

Equipment Bulletin 25-002: Chaps, Chain Saw, M-2020, Nonconformities Affecting Use, Appearance, and Serviceability

Date: June 2, 2025
Questions?  Please contact:
Equipment Technology Committee

The Equipment Technology Committee issued Equipment Bulletin: 25-002 to address a manufacturing nonconformity affecting Forest Service specification, 6170-4K Chain Saw Chaps. The issue applies to chaps manufactured in 2024 and 2025 and distributed through FedMall. These chaps may have incorrectly bound edges that expose inner protective layers.

Independent purchasers should inspect all chain saw chaps received from FedMall beginning in 2024, prior to use. Review the full Equipment Bulletin: 25-002 for inspection criteria and recommended actions.

References:

NWCG Alerts

ETC Equipment Bulletin: 25-002