Skip to main content

Mapping: GPS Use for GIS Application

Set up before going to the field

  • Make sure fresh batteries are loaded and extra sets available.
  • Transfer background maps for the area using MapSource (if available).
  • Turn unit on to initialize and acquire satellites ahead of time if you are in a new area or haven’t used the unit in at least a week. This may take as long as 20 minutes in the open, away from buildings, canopy, and obstructions.
  • Download and clear old waypoints and tracks from memory.
  • Turn off Active Track log. Set it to the preferred Collection method (Time is best) and an appropriate logging rate for the data collection. Five seconds works for most walking collection. Keep in mind the total storage of the GPS.
  • Ensure Simulator Mode is not ON when collecting data.
  • Set unit time zone and date (Ensure Daylight Savings Time if needed).
  • Check Interface Protocol is set properly.
  • Set the Coordinate System (UTM or LAT/LONG) & Datum to ensure compatibility with written coordinates you may need to navigate to or Map.
  • Set Heading to magnetic or true. If true, ensure same declination is used.

Return to Top

Field – GPS Data Collection

  • Hold GPS antenna away from body with antenna up. Better yet, hold at, or above the head. Purchase an external antenna to free hands if needed or for better reception in vehicles.
  • Mark the waypoints for point locations at beginning and ending of track log collections. Writing down a position is just backup.
  • Most GPS units will collect data no matter what the GPS quality is. It’s up to you to monitor the GPS Satellite Page for anomalies and accuracy.
  • Collect when 3D GPS is shown. Do not collect data in 2D unless necessary.

Return to Top

Waypoints

  • Collect all waypoints in Averaged Position mode if you are standing still, when possible, and if your receiver has that capability. Minimum of 10 positions, maximum of 20 minutes. Somewhere in between is enough to generate a quality position in most cases.
  • Collect an instantaneous waypoint only when moving or in a hurry, or if using the eTrex line.
  • Edit default waypoint numbers to letters or words that are more descriptive, or make good field notes to ensure you remember what features are represented by which numbers.

Return to Top

Track logs

  • Use Stop when Full or Fill Record Mode rather than wrap to prevent overwriting track log points when Active Track log becomes full.
  • Turn on Active Track log at start location and immediately begin moving.
  • Stop Active Track log when movement is stopped or mission is finished.
  • Always Stop Active Track just shy of starting point when collecting an area (polygon). Overlapping makes conversion to GIS more challenging.
  • Use caution when saving an Active Track log. Garmin will generalize active track to save space, thereby degrading data.

Return to Top

NWCG Latest Announcements

NWCG Equipment Technology Committee Releases Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention

Date: November 14, 2024
Contact: Equipment Technology Committee

The Equipment Technology Committee (ETC) has released Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention. Misaligned toolless fuel caps on Stihl chainsaws have led to recurring fuel spillage, fuel ignition, and burn injuries during wildland fire management operations.

This Safety Warning is intended to highlight the details and recommended procedures for the installation of a Stihl chainsaw toolless fuel cap, as well as how to identify and correct a misaligned, damaged, or broken fuel cap to help prevent fuel spillage.

References:

NWCG Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention

Advertencia de equipos 24-001: Prevención de derrames de la tapa de combustible sin herramientas de la motosierra Stihl

NWCG Alerts

The Incident Position Standards and Next Generation Position Task Book are now available for Equipment Time Recorder (EQTR)

Date: November 13, 2024
Contact: Incident Business Committee

NWCG is excited to announce that the NWCG Incident Position Standards for Equipment Time Recorder, PMS 350-51 and NWCG Position Task Book for Equipment Time Recorder (EQTR), PMS 311-51 are now available.

The Performance Support Package, which for EQTR, includes the Incident Position Standards and Next Generation Position Task Book were developed through the Incident Performance and Training Modernization (IPTM) effort. The Performance Support Package will support trainees, those qualified in the position, and evaluators.

References:

NWCG Equipment Time Recorder Position Page

NWCG Incident Position Standards for Equipment Time Recorder, PMS 350-51

NWCG Position Task Book for Equipment Time Recorder (EQTR), PMS 311-51

The Incident Position Standards and Next Generation Position Task Book are now available for Personnel Time Recorder (PTRC)

Date: November 13, 2024
Contact: Incident Business Committee

NWCG is excited to announce that the NWCG Incident Position Standards for Personnel Time Recorder, PMS 350-53 and NWCG Position Task Book for Personnel Time Recorder (PTRC), PMS 311-53 are now available.

The Performance Support Package, which for PTRC, includes the Incident Position Standards and Next Generation Position Task Book were developed through the Incident Performance and Training Modernization (IPTM) effort. The Performance Support Package will support trainees, those qualified in the position, and evaluators.

References:

NWCG Personnel Time Recorder Position Page

NWCG Incident Position Standards for Personnel Time Recorder, PMS 350-53

NWCG Position Task Book for Personnel Time Recorder (PTRC), PMS 311-53

NWCG Risk Management Committee Releases Safety Bulletin: 24-001 Use of Respirators on Wildland Fires

Date: November 7, 2024
Contact: Risk Management Committee

The Risk Management Committee (RMC) has released Safety Bulletin: 24-001 Use of Respirators on Wildland Fires. As wildland fire respirators are available through several established vendors, wildland fire personnel need to understand regulations and limitations of respirator use in the workplace.

Safety Bulletin 24-001 outlines the following topics regarding respirator use for wildland fires:

  • Requirements for Respirator Use
  • Voluntary Respirator Use
  • Current Respirator Options
  • Unknown Risks of Respirator Use

This bulletin also provides mitigation recommendations to help reduce smoke exposure for wildland firefighting efforts.

References:

NWCG Safety Bulletin: 24-001 Use of Respirators on Wildland Fires

NWCG Smoke Management Guide for Prescribed Fire, PMS 420-3

VIDEO: Protecting Wildfire Personnel from Smoke - How Incident Management Teams Address Smokes Risks

VIDEO: Smoke, Knowing the Risks