Skip to main content

8.7 Slope Effect on ROS

When fire moves upslope, the fuel ahead of the flame front is closer to the flame than if the slope were flatter.  This set-up "preheats" the fuels. The effects of slope on fire spread become greater as the slope increases. 

graphic showing slope effects on fire

APPROXIMATING THE ROS

An easy guide for approximately the ROS due to changes in slope is as follows:
1. The first tripling of slope roughly increases the rate of fire spread by a factor of 2. 
2. The second tripling of slope increases the rate of spread by a factor of 4 to 6, depending on fuel conditions. 

The effect of an increase in slope on ROS depends both on the absolute slope as well as on the midflame wind speed. See Section 8.2 for more information on midflame and "effective" wind speeds.

Example 1 - An area of shrubs is burning at a ROS of 4 chains per hour at an 8 percent slope. The slope increases to 24 percent. What will the ROS be? 

Step 1. How much did the slope change? The slope percent increased from 8 percent to 24 percent. This change represents an increase of three times the original slope.

Step 2. How much will this slope change affect the ROS? As stated above, a tripling of slope increases the ROS by a factor of 2. 
2 × 4 chains/hr = 8 chains/hr
 

4 chains/hr × 2 = 8 ch/hr

NWCG Latest Announcements

Next Generation Position Task Book and Updated Incident Position Description Now Available for Operations Section Chief Complex

Date: February 27, 2025
Contact: Incident Operations Subcommittee

NWCG is excited to announce that Operations Section Chief Complex (OSCC) has a Next Generation NWCG Position Task Book for Operations Section Chief Complex (OSCC), PMS 311-108 and an updated Incident Position Description.

These resources support trainees, qualified personnel, and evaluators in their respective roles.

References:

NWCG Operations Section Chief Complex Position Page 

NWCG Operations Section Chief Complex Incident Position Description 

NWCG Position Task Book for Operations Section Chief Complex (OSCC), PMS 311-108 

2025 NWCG Incident Response Pocket Guide (IRPG), PMS 461, Now Available

Date: February 27, 2025
Contact: Incident Operations Subcommittee

NWCG is excited to announce that the 2025 NWCG Incident Response Pocket Guide (IRPG), PMS 461, is now available. Visit NWCG's website to learn about the major updates and changes in the 2025 version of the IRPG. The NWCG Guia de Respuesta de Incidente de Bolsillo (GRI), PMS 461-ES is available electronically and will be available from Great Basin Cache by early summer 2025.

All hard copy materials, including the IRPG, are ordered through the Great Basin Cache (GBK). Information on the ordering process can be found in the National Fire Equipment System (NFES) Catalog.

References:

2025 IRPG Information 

NWCG Incident Response Pocket Guide (IRPG), PMS 461 

NWCG Guia de Respuesta de Incidente de Bolsillo (GRI), PMS 461-ES 

NWCG NFES Catalog - Part 2: Publications, PMS 449-2 

2025 Professional Reading Program

Date: February 18, 2025
Contact: Wildland Fire Leadership Development Program (WFLDP)

The Wildland Fire Leadership Development Program is announcing the 2025 Professional Reading list! The goal of the annual reading list is to promote the reading and discussion of the books throughout the year.

The five books chosen for this year are: Surf When You Can by Brett Crozier, Man’s Search for Meaning by Viktor E. Frankl, Elephant Company by Vicki Constantine Croke, Simply Managing by Henry Mintzberg, and Chop Wood Carry Water by Joshua Metcalf.

References:

Professional Reading Program

Task Group Volunteers Needed to Update the Property Loss or Damage Report, OF 289

Date: February 5, 2025
Contact: Julie Bennett, Incident Business Committee Chair

The Incident Business Committee (IBC) is requesting volunteers for a new task group to revise the 1981 version of the Property Loss or Damage Report, OF 289 and create an incident replacement job aid. The volunteers may be recruited from within or outside the Geographic Area Incident Business Committees.

References:

IBC Memorandum 25-02

IBC Correspondence