9.8 Production Rates

When planning an attack on a fire, the length and width of the line must be estimated, along with the capabilities of the hand crew(s), to determine how many crews will be needed. Generally, a 15-person crew should be able to construct a 3-foot fireline around a 1-acre grass fire in 1 hour. Below are some average ideal rates for hand crew production rates in various vegetation.

hand crew production rates

Example 1 - Patricia spots a fire burning in open prairie. She determines that the fire has a perimeter of 1,800 feet. How many hand crews should she assign to construct a 3-foot line around the fire in 1 hour?

Step 1. Look under the column for grass vegetation of the hand crew production rates chart above. Follow the column down vertically.

Step 2. Look for the row that tells how much line a crew can cut per hour. Follow the row across horizontally. Where the two lines intersect is the number of lines per hour an average crew can cut in those conditions. 
One 15-person can cut 900 ft of line per hour

Step 3. Use this information to calculate the number of hours it will take one crew to construct 1,800 feet of line.

1,800 feet of line calculation
It will take 1 crew 2 hours to cut 1,800 feet of line.
Step 4. Determine how many crews it will take to construct the line in 1 hour.

1 crew 2 hours 1800 feed of line

To cut 1,800 feet of line in 1 hour, Patricia needs to assign two crews of 15 people each.
 

When arriving at a fire scene, always assess the entire situation to determine the best way to suppress the fire.

 

NWCG Latest Announcements

Updated NWCG Standards for Fire Unmanned Aircraft Systems Operations, PMS 515

Date: April 23, 2025
Questions?  Please contact:
Interagency Fire Unmanned Aircraft Systems Subcommittee

The NWCG Standards for Fire Unmanned Aircraft Systems Operations, PMS 515 standardizes processes and procedures for the interagency use of Unmanned Aircraft Systems (UAS), including pilot inspections and approvals. This updated publication provides the aviation community with standards to ensure UAS are used safely, effectively, and efficiently in support of fire management goals and objectives.

References:

NWCG Standards for Fire Unmanned Aircraft Systems Operations, PMS 515

NWCG National Interagency Aviation Committee

ETC Bulletin 25-001: Retrofitted Hot/Cold Beverage Kits - 2025 Field Season

Date: April 16, 2025
Questions?  Please contact:
Equipment Technology Committee

Due to spout failures and the associated risk of burn injuries, manufacturers have retrofitted the Hot/Cold Beverage Kits using a heat-shrinking band to secure the black spout at the insertion site. The updated kits feature a fluorescent label on each full kit assembly for easy identification. Catering units are encouraged to confirm the clear heat-shrinking bands are intact around each spout before filling.

ETC Bulletin 24-001 regarding Hot/Cold Beverage Kits has been archived and replaced by ETC Bulletin 25-001 for the 2025 season.

References:

NWCG Alerts

ETC-EB-25-001 Retrofitted Hot/Cold Beverage Kits

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog