Skip to main content

Create and Share Web Maps


Offline mobile data collection through the ArcGIS apps is quickly becoming the most common method for gathering incident data due to its convenience and provided common operating picture.

For the 2025 season, Field Maps is the recommended mobile app for use with official Incident Web Map Templates. Please encourage all field editors to download Field Maps on their mobile device.

Several predefined options exist to implement offline mobile data collection on wildfire incidents using ArcGIS apps. The appropriate workflow should be selected based on the needs of the team and scale of the incident. It is best to begin an incident from a web map template to provide the field user with a consistent offline mapping product.

All the web map templates can be found in the Incident Resources Group.


The incident web map templates have the following settings by default:

  • The Event Polygon layer editing is disabled
  • Features where FeatureStatus = ‘Archive’ are filtered to not display
  • Features where DeleteThis = ‘Yes’ are filtered to not display

Job Aids

The Basic Web Map Workflow

Quick and easy to implement, the Basic Workflow works best for smaller incidents or incidents with fewer field editors.

A single web map is shared for use in  Field Maps and all edits are reviewed and managed by the GISS.

Template Quick Links

Advanced Web Map Workflows

There are two workflows that go beyond the out-of-the-box Basic Workflow. The Approval Workflow and the Suppression Repair Workflow. The Approval Workflow, which consists of three web maps, gives an ‘approver’ (usually the Situation Unit Leader [SITL]) the ability to approve every new feature before it becomes visible in the Viewer web map (and/or printed maps).

The Suppression Repair Workflow can be used in conjunction with either the Basic or Approval Workflows. It is used to track and record suppression repair activities on an incident.

Approval Web Map Workflow

The ‘Approval’ part of the workflow gives the Situation Unit the ability to change the status of new features from the default “Proposed” to “In Review,” “Approved,” or “Archive.” The approver (SITL) will work with Operations to change features from “Proposed” to “Approved.” Team members that have access to the View Only Map cannot see any new features until they are “Approved” and a definition query in ArcGIS Pro can be used on incident maps to remove any non-approved features from display.

The SITL Approver App can be used by SITLs in the NIFC Org to manage the Approval Status of incident features without the need to create additional content. This app provides a quick and easy way for the SITL to monitor for incoming features from the field.
Navigate to the Incident Resources group to locate the latest SITL Approver App.

Template Quick Links

Suppression Repair Workflow

The Suppression Repair Workflow can be used in conjunction with either the Basic Workflow or the Approval Workflow to track the status of the suppression repair efforts on a fire. At any time during the life cycle of a feature, the Repair specific fields can be updated.

The Repair Status service is a Hosted View off the same data as the NIFS. The Accountable Property, Point and Line Repair Status layers will automatically update with any edits to the features in the NIFS. In the Suppression Repair web maps, any changes to a feature’s Repair Status field will result in a change in the feature’s halo color for easy identification.

Template Quick Links

Last Modified / Reviewed:

NWCG Latest Announcements

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508

WFSTAR 2025 Core Component Module Package and 2024 Fire Year in Review Now Available

Date: March 14, 2025
Questions?  Please contact:
Joe Schindel at mschindel@blm.gov
 

The 2025 Core Component Module Package for RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) and the 2024 Fire Year in Review are now available on the NWCG website. The 2025 Core Component Module Package provides all content needed to deliver RT-130.

References:

2025 Core Component Module Package

2024 Fire Year in Review Module

NEW! NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053

Date: March 12, 2025
Contact: Wildland Urban Interface Mitigation Committee

The NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 provides mitigation practitioners at all experience levels with recommendations on the most effective and efficient ways to accomplish mitigation work in communities at risk to wildfire damage or destruction. The content in this guide was written in coordination with the NWCG Standards for Mitigation in the Wildland Urban Interface, PMS 052.

References:

NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430