Skip to main content

Export to the Progression GDB


There are a multitude of ways to create the Progression Map and to store the required perimeters. No one way is right or required, as long as the data and the resulting map follow GeoOps standards in naming, attribution, and structure.

However, following the best practices outlined here will allow for the greatest flexibility in the process and ease of data access and use.

The Wildfire Daily Fire Perimeter should be exported after every update, starting on day one. It is always easier to do immediately rather than searching through backups.

  1. From the Edit Project, select your incident’s Wildfire Daily Fire Perimeter in the Event Polygon layer.
  2. Export the selected Wildfire Daily Fire Perimeter.
    Image
  3. Save the Wildfire Daily Fire Perimeter as a feature classes to the Progression GDB preserves the Event Schema and allows for easily combining data. Ensure the date and time the perimeter was collected are saved in the name (part of the GeoOps Standard) and the attributes (PolygonDateTime, a required-when-applicable field in the Event Schema). This way the perimeter date is easily found from any interface and preserved if/when data is combined.
    Image

 

Modified / Reviewed:

NWCG Latest Announcements

Updated NWCG Standards for Water Scooping Operations, PMS 518

Date: December 19, 2024
Contact: Water Scooper Operations Unit

The NWCG Standards for Water Scooping Operations, PMS 518 establishes the standards for dispatching, utilizing, and coordinating water scooping aircraft on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, and any local, state, or geographic/regional water scooping plans.

References:

NWCG Standards for Water Scooping Operations, PMS 518

Updated NWCG Standards for Aerial Supervision, PMS 505

Date: December 19, 2024
Contact: Interagency Aerial Supervision Subcommittee

The Interagency Aerial Supervision Subcommittee has updated the NWCG Standards for Aerial Supervision, PMS 505. PMS 505 establishes standards for aerial supervision operations for national interagency wildland fire operations. 

References:

NWCG Standards for Aerial Supervision, PMS 505

New Job Aids Available: Packing Lists for Wildland Fire Fireline Personnel and Support Staff, J-101 and J-102

Date: December 3, 2024
Contact: NWCG TRAINING

Two new job aids are now available: Packing List for Wildland Fire Fireline Personnel, J-101 and Packing List for Wildland Fire Support Personnel, J-102, should serve as a baseline for items needed on a wildland fire assignment. These lists will help personnel prepare for a 14 to 21-day assignment on the fireline or in a support role.

References:

Job Aid Catalog

NWCG Packing List for Wildland Fire Fireline Personnel, J-101

NWCG Packing List for Wildland Fire Support Staff, J-102

NWCG Equipment Technology Committee Releases Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention

Date: November 14, 2024
Contact: Equipment Technology Committee

The Equipment Technology Committee (ETC) has released Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention. Misaligned toolless fuel caps on Stihl chainsaws have led to recurring fuel spillage, fuel ignition, and burn injuries during wildland fire management operations.

This Safety Warning is intended to highlight the details and recommended procedures for the installation of a Stihl chainsaw toolless fuel cap, as well as how to identify and correct a misaligned, damaged, or broken fuel cap to help prevent fuel spillage.

References:

NWCG Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention

Advertencia de equipos 24-001: Prevención de derrames de la tapa de combustible sin herramientas de la motosierra Stihl

NWCG Alerts