Skip to main content

Review and Export Layout


Refer to the Map Elements page of GeoOps and review your layout to ensure that all required elements (STANDL SGD) are present and correct.

Export the layout from the Share tab on the ribbon > Export Layout button. Export settings may vary depending on the plotter and driver used. Ensure export of georeference information and font embedding are good practice.

Review the exported layout to ensure it appears as intended, i.e., all fonts display correctly, assignment breaks and labels appear, labels do not overlap, there are no data selections in the map, etc.

If needed, reduce or optimize the size of the exported PDF. This can be done in Adobe Acrobat Pro, Foxit PDF, or with several free online tools. The smaller the file size of the PDF, the faster uploads to and downloads from FTP and/or SharePoint will be for both GISS and firefighters using the products in the Avenza Maps application.

Additional Considerations for Digital-Only Geospatial PDFs

All PDFs exported from ArcGIS are geo-enabled (unless default settings have been modified) and can be used in any software that works with 'GeoPDFs.'

However, creating a Geospatial PDF designed specifically for digital use in an application like Avenza Maps follows a different workflow than creating a traditional paper map since it is not constrained by paper sizes. The Geospatial PDF should be designed with the user's area of interest and map scale in mind first with the "page" size determined second.

Operational needs will dictate the type of Geospatial PDF to be created. Once that determination is made, decide on the base map that best suits that type of map. For example, an IAP map will require topography, while transportation will need a roads layer. Aerial imagery can also be very beneficial for some maps. In some cases, the background on the topographic map can be made transparent and the topo can be displayed on top of aerial imagery.

The appropriate map scale for use on a mobile device also needs to be determined. Typical topo maps should be at 1:24k; aerial imagery may be 1:8k-12k; and a travel map may be 1:50k-100k.

Focus on the map scale the end-user needs to do their job. Since a PDF is a single static image, not a tile cache like a web map, there will be no additional information when a user "zooms in," only what's already there but bigger. This is why the scale is important, if the features, and labels are all sized for 8k, but the map needs to be used at 24k, everything will be far too small.

The last consideration is the “page size.” Since the map is designed for digital use only and not being printed, it does not need to adhere to a standard size. Rather than the paper size, the “page size” is determined by the area of interest and ArcMap/Pro allows you to set a custom page size to cover the area that you need. There is a trade-off between page size, scale, and output file size, so be sure to keep that in mind during this process. The PDF file should be compressed/optimized for easier distribution before being loaded onto devices for use on the fireline.

The map must still have all the standard map elements (STANDL SGD), however, a few modifications are useful. The title, legend, etc. need to be legible, but they don’t have to be large enough to read at a 1:1 scale. Additionally, the amount of white space around the borders can be minimized since there is no risk of a printer cutting it off.

After exporting a map designed primarily for digital consumption, it’s best practice to test the map in the application in which it will be used.

Job Aids

 

Last Modified / Reviewed:

NWCG Latest Announcements

Updated NWCG Guide for Wildland Fire Modules, PMS 431

Date: May 14, 2025
Questions?  Please contact:
Fire Use Subcommittee

The updated NWCG Guide for Wildland Fire Modules, PMS 431 serves as a supplemental resource for wildland fire module operations, providing information frequently used in the field.

PMS 431 defines the organizational structure, staffing, and qualifications for Type 1 and Type 2 Wildland Fire Modules, outlining their roles in wildland fire suppression, prescribed fire, and resource management. The NWCG Guide for Wildland Fire Modules, PMS 431, should be used in conjunction with the NWCG Standards for Wildland Fire Module Operations, PMS 430.

References:

NWCG Guide for Wildland Fire Modules, PMS 431

NWCG Standards for Wildland Fire Module Operations, PMS 430

Updated NWCG Standards for Wildland Fire Resource Typing, PMS 200 Now Includes Off-Highway Vehicle Typing Standards

Date: May 13, 2025
Questions?  Please contact:
Mobile Fire Equipment Subcommittee 

The NWCG Standards for Wildland Fire Resource Typing, PMS 200 has been updated to include newly developed Off-Highway Vehicle (OHV) typing standards. These standards organize OHV information into logical categories and outline key safety requirements for occupants.

NWCG Standards for Wildland Fire Resource Typing, PMS 200 establishes minimum typing standards for aircraft, crews, and equipment used in national mobilization to wildland fire incidents. Typing designations are assigned based on measurable capability and performance criteria.

References:

NWCG Standards for Wildland Fire Resource Typing, PMS 200

NEW! S-204, Interpersonal and Critical Thinking Skills for Safety Officers Now Available

Date: May 12, 2025
Questions?  Please contact:
Risk Management Committee

The S-204, Interpersonal and Critical Thinking Skills for Safety Officers self-directed online course is now available! Developed through the Incident Performance and Training Modernization (IPTM) effort, this training supports individuals working towards Safety Officer, Field (SOFF) incident qualifications.

S-204, Interpersonal and Critical Thinking Skills for Safety Officers focuses on facilitating hazard mitigation conversations and building trust to influence safety-related decisions. Individuals can self-enroll through the Wildland Fire Learning Portal (WFLP).

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

S-204, Interpersonal and Critical Thinking Skills for Safety Officers 

NWCG Safety Officer, Field (SOFF) Position Page

Wildland Fire Learning Portal

Great Basin Cache Upgrading to New Inventory System

Date: May 7, 2025
Questions?  Please contact:
Great Basin Cache
Phone: (208) 387-5104
Fax: (208) 387-5573

The Great Basin Cache (GBK) is transitioning to a new inventory system to better serve the wildland fire community. During this upgrade, GBK will be unable to process standard orders from Part 1: Fire Supplies and Equipment and Part 2: Publications between May 8-20, 2025, with exceptions made for emergency fire orders. Orders will be accepted through close of business May 7.

To browse the latest available items, please refer to the National Fire Equipment System (NFES) catalogs. 

References:

NWCG NFES Catalog-Part 1: Fire Supplies and Equipment, PMS 449-1

NWCG NFES Catalog-Part 2: Publications, PMS 449-2