Configure the ArcGIS Pro Project Template


Configuring the ArcGIS Pro Project Template will streamline data edits and map creation and provide a solid foundation for the duration of an incident.

Note: It is very important to begin with a new zip of the Current_GeoOps_Folder_Structure when setting up a project. This will allow the Pro Project Template to establish the correct file pathways. Reusing the folder structure or the Pro Project Template is not recommended.
  1. In the \projects folder, open the 2024_ProProjectTemplate APRX file.
  2. A display issue affects the Home Folder name in some versions of Pro. In the Project Folders under Contents, rename the Home Folder after confirming the underlying connection is correct.
    Image
    Catalog window is open. Path C:\2023_Incidents\2023_Demo is circled in red.
  3. In the Project Databases folder under Contents, rename the Default GDB (other_incident_data GDB) with the incident name and Unique Fire ID.
    Image
    Note: A slow double-click on the database name in the Catalog View must be used to update the name. The Rename button will be grayed out. Be sure to rename the Default GDB prior to opening the provided Map View or a database lock will be created, and you will be unable to rename the Default GDB.
  4. Rename the Annotation and Progression GDBs.
    Image
  5. Navigate to the Project Maps folder. Open the provided map view {MapType}_2024_{IncidentName}.
    1. Add the Incident Name to the map title, but leave {MapType}.
    2. Repair the path of the DynamicTextUpdate table to the existing table in the Default GDB (other_incident_data.gdb).
      Image
    3. Set the coordinate system of the map to a local projected coordinate system.
      Image
    Note: By setting the coordinate system now, all incident projects will inherit this configuration. If you do not wish to use the same coordinate system for all incident projects, this can be set after each Save-As of the ProProjectTemplate APRX.
  6. Save the Project.

 

Modified / Reviewed:

NWCG Latest Announcements

New Job Aids Available: Packing Lists for Wildland Fire Fireline Personnel and Support Staff, J-101 and J-102

Date: December 3, 2024
Contact: NWCG TRAINING

Two new job aids are now available: Packing List for Wildland Fire Fireline Personnel, J-101 and Packing List for Wildland Fire Support Personnel, J-102, should serve as a baseline for items needed on a wildland fire assignment. These lists will help personnel prepare for a 14 to 21-day assignment on the fireline or in a support role.

References:

Job Aid Catalog

NWCG Packing List for Wildland Fire Fireline Personnel, J-101

NWCG Packing List for Wildland Fire Support Staff, J-102

NWCG Equipment Technology Committee Releases Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention

Date: November 14, 2024
Contact: Equipment Technology Committee

The Equipment Technology Committee (ETC) has released Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention. Misaligned toolless fuel caps on Stihl chainsaws have led to recurring fuel spillage, fuel ignition, and burn injuries during wildland fire management operations.

This Safety Warning is intended to highlight the details and recommended procedures for the installation of a Stihl chainsaw toolless fuel cap, as well as how to identify and correct a misaligned, damaged, or broken fuel cap to help prevent fuel spillage.

References:

NWCG Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention

Advertencia de equipos 24-001: Prevención de derrames de la tapa de combustible sin herramientas de la motosierra Stihl

NWCG Alerts

The Incident Position Standards and Next Generation Position Task Book are now available for Equipment Time Recorder (EQTR)

Date: November 13, 2024
Contact: Incident Business Committee

NWCG is excited to announce that the NWCG Incident Position Standards for Equipment Time Recorder, PMS 350-51 and NWCG Position Task Book for Equipment Time Recorder (EQTR), PMS 311-51 are now available.

The Performance Support Package, which for EQTR, includes the Incident Position Standards and Next Generation Position Task Book were developed through the Incident Performance and Training Modernization (IPTM) effort. The Performance Support Package will support trainees, those qualified in the position, and evaluators.

References:

NWCG Equipment Time Recorder Position Page

NWCG Incident Position Standards for Equipment Time Recorder, PMS 350-51

NWCG Position Task Book for Equipment Time Recorder (EQTR), PMS 311-51

The Incident Position Standards and Next Generation Position Task Book are now available for Personnel Time Recorder (PTRC)

Date: November 13, 2024
Contact: Incident Business Committee

NWCG is excited to announce that the NWCG Incident Position Standards for Personnel Time Recorder, PMS 350-53 and NWCG Position Task Book for Personnel Time Recorder (PTRC), PMS 311-53 are now available.

The Performance Support Package, which for PTRC, includes the Incident Position Standards and Next Generation Position Task Book were developed through the Incident Performance and Training Modernization (IPTM) effort. The Performance Support Package will support trainees, those qualified in the position, and evaluators.

References:

NWCG Personnel Time Recorder Position Page

NWCG Incident Position Standards for Personnel Time Recorder, PMS 350-53

NWCG Position Task Book for Personnel Time Recorder (PTRC), PMS 311-53