Skip to main content

Repair Event Layer Files


For a refresher on layer files, please see the GIS Concepts Review document.

Repair Event Layers in the Edit Project

Use the Event layers in the edit map instead of the GISS Edit service directly. While the symbols are now the same, several other settings are saved in the layer files that are not available directly from the service, including caching, advanced labeling, and symbol display order. Critically, each layer is set to not cache any data locally in ArcGIS Pro to ensure the data displayed is always up to date.

  1. Repair the path of the Event Group - All Layers  in the Contents pane of the edit map to the newly created Offline Copy in the \incident_data\edit folder (e.g. GISSEdit_NIFS_2025_A74A6C…).
  2. Remove the GISS Edit Service (National Incident Feature Service 2025) group to avoid confusion. 

    Label point and databases main

  3. Save the Edit Project. Your Contents pane should resemble the following: 

    Re-edit the project contents pane

     

The Event Layer Files that are added to the provided map view of the Pro Project Template aprx can be found in the \tools folder in the GeoOps Incident Directory Structure.

Nearly every map is going to start with the Event Group All Layers YYYY.lyrx file, the primary two types being the Edit Project and Master Projects. The key difference between these two is the database to which the layer file path is repaired.

It is very important to keep these two separate because incident maps should never be created using the Offline Copy and data edits should never be made outside of the Edit Project.

Event Layer File Template Implementation Diagram

Flow chart showing the use of the template layer file used in both the Edit Project and Master Map Projects.

Keeping the Edit Project separate from Master Projects is a crucial component of the GISS Workflow and proper layer file management is essential to this.

A layer file stores symbology, labeling, and Feature Templates and can be used to quickly create projects. Layer files also store files paths and can easily add the wrong data to a project resulting in inaccurate products or wasted time editing the wrong database.

Following best practices will avoid any mishaps, but it is always important to be aware of what data you are working with and how all your databases, maps, projects, local copies, and layer files all fit together.

Event Layer Files in the \tools folder

  • Event Group All Layers 202X.lyrx – All NIFS layers with configured Event Point label classes that can be easily converted to annotation.
  • Event Group BAM Large Symbols 202X.lyrx – Oversized Point and Line symbols use in Briefing Area Map (BAM). Increase or decrease the size as necessary.
  • Event Group IR 202X.lyrx – Print symbology for the IR feature classes.
  • Event Group Repair Status 202X.lyrx – Group layer with Accountable Property, Event Point, and Event Line symbolized based on the RepairStatus field. This layer file should be used in conjunction with the Event Group All 2025 layer file to provide a Repair Status “halo” for features.
  • Event Group Simplified Web Symbols 202X.lyrx – Simplified symbology.
  • Multipage Label Lines 202X.lyrx – ‘Invisible’ Lines with assignment labels (e.g. Div, Branch) used in multipage map projects. Repair to the MultipageLabelLine feature class in the other_incident_data.gdb.
  • Structure Triage 202X.lyrx –Structure Triage symbology based on the guidelines in the Incident Response Pocket Guide page 14+15. Alternate Triage categories for California’s FIRESCOPE are included in the data but not provided as a layer file.

 

Last Modified / Reviewed:

NWCG Latest Announcements

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

Date: June 3, 2025
Questions?  Please contact:
Emergency Medical Committee

The Emergency Medical Committee has issued interim guidance for Rapid Extraction Module Support (REMS) teams. Until further notice, Type I and II REMS teams must designate a team leader qualified at Firefighter Type 1 Squad Boss (FFT1) or higher. This temporary change replaces the Single Resource Boss (SRB) requirement, which is currently not feasible due to administrative barriers.

This memorandum does not include any other changes to the NWCG Standards for Rapid Extraction Module Support, PMS 552. This interim change takes effect immediately and will remain in place until further notice.

References:

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

NWCG Standards for Rapid Extraction Module Support, PMS 552

Equipment Bulletin 25-002: Chaps, Chain Saw, M-2020, Nonconformities Affecting Use, Appearance, and Serviceability

Date: June 2, 2025
Questions?  Please contact:
Equipment Technology Committee

The Equipment Technology Committee issued Equipment Bulletin: 25-002 to address a manufacturing nonconformity affecting Forest Service specification, 6170-4K Chain Saw Chaps. The issue applies to chaps manufactured in 2024 and 2025 and distributed through FedMall. These chaps may have incorrectly bound edges that expose inner protective layers.

Independent purchasers should inspect all chain saw chaps received from FedMall beginning in 2024, prior to use. Review the full Equipment Bulletin: 25-002 for inspection criteria and recommended actions.

References:

NWCG Alerts

ETC Equipment Bulletin: 25-002

2024 Wildland Fire Emergency Medical Service Awards

Date: May 22, 2025
Questions?  Please contact:
Emergency Medical Committee

The NWCG Emergency Medical Committee (EMC) is proud to announce the recipients of the 2024 Wildland Fire Emergency Medical Service Awards. Each year, EMC recognizes individuals and groups who have demonstrated exceptional actions or accomplishments that go above and beyond their normal mission or job duties.

Congratulations to all the awardees and nominees. Through leadership and initiative, they have made significant contributions to the safety and well-being of the wildland fire community. These honors are well deserved.

References:

2024 Wildland Fire EMS Awards

NWCG Emergency Medical Committee

NWCG Welcomes the Incident Management Teams Association as an Associate Member

Date: May 21, 2025
Questions?  Please contact:
https://www.nwcg.gov/contact-us

The NWCG Executive Board is honored to announce that the Incident Management Teams Association (IMTA) has joined the National Wildfire Coordinating Group as an associate member.

IMTA is a dedicated group of incident management professionals committed to enhancing the profession by promoting standards and fostering collaboration across federal, state, local, Tribal, and private sector partners throughout all phases of incident management.

“Joining NWCG aligns with our mission to elevate incident management professionals nationwide,” said Dr. Randal Collins, President of IMTA. “This is a proud moment for all of us committed to advancing public safety.”

References:

Incident Management Teams Association

National Wildfire Coordinating Group